VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Updated: 01.08.2026
Status Live
Value
Scope
Average
Sale ends
Location GA - Manheim Atlanta
Pickup At the Dealer
Highlights CR REPORT
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $140,000
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $890
5. Ocean freight from SAVANNAH $675
Total to Rotterdam
$143,815 ~ 536 861 PLN
5.0
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score 96
Similar vehicles 91 - 96
Owners 0
Accidents 0
ANNOUNCEMENTS AND COMMENTS

Announcements

  • EXEC,DRV AST PRO, CERM BRAKES, MDRVPROF

Damage notes

Clean title / No visible damage recorded in the system.

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
Packages

No data

Equipment

No detailed data / See the list below

Standard equipment
  • Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
  • Black Grille
  • Black Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
  • Black Side Windows Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper w/Black Rub Strip/Fascia Accent
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
  • Cornering Lights
  • Fixed Glass Sky Lounge Panoramic 1st And 2nd Row Sunroof w/Power Sunshade
  • Fixed Rear Window w/Defroster
  • Galvanized Steel/Aluminum Panels
  • Headlights-Automatic Highbeams
  • LED Brakelights
  • Light Tinted Glass
  • Lip Spoiler
  • Perimeter/Approach Lights
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
  • Tire Mobility Kit
  • Tire Specific Low Tire Pressure Warning
  • Tires: 20" Fr & 21" Rr Staggered High Performance
  • Wheels: 20" Fr & 21" Rr M Dual-Spoke Dark Grey includes Style 951M
  • Window Grid Diversity Antenna
  • 1 12V DC Power Outlet
  • 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
  • Air Filtration
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Space Lights
  • Carpet Floor Trim
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Driver / Passenger And Rear Door Bins
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
  • Driver Foot Rest
  • Driver Information Center
  • Driver Seat
  • Extended Merino Leather Upholstery
  • Fade-To-Off Interior Lighting
  • Front And Rear Map Lights
  • Front Center Armrest and Rear Center Armrest w/Storage
  • Full Alcantara Simulated Suede Headliner
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Floor Console w/Covered Storage and 1 12V DC Power Outlet
  • Head-Up Display
  • Heated Front Seats
  • Illuminated Front Cupholder
  • Illuminated Locking Glove Box
  • Interior Lock Disable
  • Interior Trim includes Aluminum Instrument Panel Insert, Aluminum Door Panel Insert, Piano Black Console Insert, Metal-Look Interior Accents and Merino Leather Upholstered Dashboard
  • Lumbar Support
  • Memory Settings includes Driver And Passenger Seats, Door Mirrors, Steering Wheel and Head Restraints
  • Merino Leather Door Trim Insert
  • Metal-Look Gear Shifter Material
  • Multi-Function Seats
  • Outside Temp Gauge
  • Passenger Seat
  • Power Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Power Front Seats
  • Power Fuel Flap Locking Type
  • Power Tilt/Telescoping Steering Column
  • Rear Cupholder
  • Redundant Digital Speedometer
  • Roll-Up Cargo Cover
  • Sport Heated Leather Steering Wheel w/Auto Tilt-Away
  • Trunk/Hatch Auto-Latch
  • Valet Function
  • 15.9 Gal. Fuel Tank
  • 3.31 Axle Ratio
  • ABS And Driveline Traction Control
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • Battery w/Run Down Protection
  • Double Wishbone Front Suspension w/Coil Springs
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Electronic Stability Control (ESC)
  • Electronic Transfer Case
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • Hybrid Electric Motor
  • Lithium Ion (li-Ion) Traction Battery w/11 kW Onboard Charger and 2 Hrs Charge Time @ 220/240V
  • Multi-Link Rear Suspension w/Coil Springs
  • Quasi-Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
  • Regenerative 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
  • Transmission w/Driver Selectable Mode, M Steptronic Sequential Shift Control w/Steering Wheel Controls and Oil Cooler
  • Active Blind Spot Detection Blind Spot
  • Airbag Occupancy Sensor
  • Collision Mitigation-Front
  • Cross Traffic Warning (rear) with Brake Intervention
  • Curtain 1st And 2nd Row Airbags
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Evasion Assist
  • Front Collision Mitigation with Left Turn Warning
  • Immobilizer
  • Lane Keeping Assistant/Lane Departure Warning Lane Departure Warning
  • Lane Keeping Assistant/Lane Departure Warning Lane Keeping Assist
  • Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
  • Perimeter Alarm
  • Rear Child Safety Locks
  • Side Impact Beams
  • Cruise Control w/Steering Wheel Controls
  • FOB Controls includes Keyfob Cargo Access, Keyfob Window Activation and Keyfob Sunroof/Convertible Roof Activation
  • HVAC includes Underseat Ducts and Console Ducts
  • Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Power Liftgate Rear Cargo Access
  • Power Rear Windows and Fixed 3rd Row Windows
  • Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
  • Rear HVAC w/Separate Controls
  • Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button
  • Remote Releases includes Comfort Access Proximity Cargo Access
  • Tailgate/Rear Door Lock Included w/Power Door Locks
  • Voice Activated Dual Zone Front And Rear Automatic Air Conditioning
  • Wireless Device Charging

Import pojazdu 2027 BMW M5 Touring Wagon do Polski

Ten pojazd (2027 BMW M5 Touring Wagon, VIN WBS83GV01VCY06181) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 599 700 PLN.

Podobne pojazdy BMW from the US

2022 BMW M5 Sedan CSWyróżniający się · 4.0
2022 BMW M5 Sedan CS
Przebieg
9318 mi
Location
PA - Manheim Pennsylvania
VIN
WBS73CH01NCJ57286
$131,000Zobacz ofertę
2026 BMW M5 Touring WagonIdealny · 4.8
2026 BMW M5 Touring Wagon
Przebieg
3410 mi
Location
NV - Manheim Nevada
VIN
WBS83GV05TCW76709
$129,788Zobacz ofertę
2026 BMW M5 Touring WagonIdealny · 4.9
2026 BMW M5 Touring Wagon
Przebieg
3024 mi
Location
PA - WEST CHESTER
VIN
WBS83GV06TCW68960
$127,209Zobacz ofertę
2025 BMW M5 Touring WagonIdealny · 4.9
2025 BMW M5 Touring Wagon
Przebieg
5064 mi
Location
PA - WEST CHESTER
VIN
WBS83GV03SCV75943
$125,455Zobacz ofertę
2025 BMW M5 Touring WagonIdealny · 5.0
2025 BMW M5 Touring Wagon
Przebieg
5590 mi
Location
TX - PLANO
VIN
WBS83GV09SCU62014
$122,500Zobacz ofertę
2025 BMW M5 Touring WagonIdealny · 5.0
2025 BMW M5 Touring Wagon
Przebieg
9369 mi
Location
TX - GRAPEVINE
VIN
WBS83GV07SCV24249
$118,500Zobacz ofertę
2026 BMW M5 SedanIdealny · 5.0
2026 BMW M5 Sedan
Przebieg
9013 mi
Location
TX - HOUSTON
VIN
WBS83FK01TCV18270
$117,991Zobacz ofertę
2026 BMW M5 Touring WagonDoskonały · 4.5
2026 BMW M5 Touring Wagon
Przebieg
3384 mi
Location
NJ - Manheim New Jersey
VIN
WBS83GV09TCW75496
$116,000Zobacz ofertę
2025 BMW M5 Touring WagonIdealny · 4.9
2025 BMW M5 Touring Wagon
Przebieg
910 mi
Location
WA - Manheim Seattle
VIN
WBS83GV09SCU55824
$115,000Zobacz ofertę
2026 BMW M5 SedanIdealny · 5.0
2026 BMW M5 Sedan
Przebieg
2900 mi
Location
MI - TROY
VIN
WBS83FK08TCW82535
$113,000Zobacz ofertę
2026 BMW M5 SedanZnakomity · 4.3
2026 BMW M5 Sedan
Przebieg
7844 mi
Location
FL - West Palm Beach
VIN
WBS83FK08TCX56519
$113,000Zobacz ofertę
2025 BMW M5 SedanIdealny · 4.9
2025 BMW M5 Sedan
Przebieg
4200 mi
Location
CO - COLORADO SPRINGS
VIN
WBS83FK01SCS90964
$110,000Zobacz ofertę
2026 BMW M5 SedanIdealny · 4.8
2026 BMW M5 Sedan
Przebieg
16 243 mi
Location
NJ - Manheim NY Metro Skyline
VIN
WBS83FK04TCW08240
$109,900Zobacz ofertę
2023 BMW M5 SedanDoskonały · 4.6
2023 BMW M5 Sedan
Przebieg
11 678 mi
Location
NJ - Manheim New Jersey
VIN
WBS83CH02PCL49405
$99,990Zobacz ofertę
2023 BMW M5 SedanIdealny · 5.0
2023 BMW M5 Sedan
Przebieg
10 864 mi
Location
GA - Manheim Georgia
VIN
WBS83CH0XPCL88324
$86,975Zobacz ofertę
2023 BMW M5 SedanDoskonały · 4.6
2023 BMW M5 Sedan
Przebieg
20 254 mi
Location
VA - FREDERICKSBURG
VIN
WBS83CH02PCM84058
$85,000Zobacz ofertę
2025 BMW i7 M70Znakomity · 4.2
2025 BMW i7 M70
Przebieg
4698 mi
Location
FL - Manheim Palm Beach
VIN
WBY83EH06SCU57522
$139,000Zobacz ofertę
2026 BMW M2 CSIdealny · 4.8
2026 BMW M2 CS
Przebieg
1083 mi
Location
FL - Manheim Fort Lauderdale
VIN
3MF33DM07T8F94115
$139,000Zobacz ofertę