2022 BMW M5 Sedan CS
Listed as: 2022 BMW M5 Sedan CS
WBS73CH01NCJ57286
•
9,318 mil
•
AWD
•
4.4L 8 Cyl Turbo Gasoline Auto
•
Gasoline/Other
•
Auto
ALL
25
Limited-time offer
Updated: 21.07.2026
Status
Sold
Value
Scope
$140,000 - $150,000
Average
$145,000
Location
PA - Manheim Pennsylvania
Pickup
At the Dealer
Seller
Givemethevin Llc
Highlights
CR REPORT
Sold for:
$131,000
Import Calculator
Estimated costs
Price to Rotterdam
USD
1. Vehicle value
$131,000
2. Auction fee
$1,750
3. Service fee
$500
4. Ground transport
$820
5. Ocean freight from NEW YORK
$675
Total to Rotterdam
$134,745
~ 504 283 PLN
4
Auto
G
rade
Average
Drives
Starts
Interior odor
Key1
Key fob?
Vehicle History
ANNOUNCEMENTS AND COMMENTS
Announcements
- No additional announcements
Damage notes
Clean title / No visible damage recorded in the system.
Documents
Title Status
Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
- The vehicle's purchase value under the "Buy Now" system
- AUTOMAX commission
- Ground transport within the U.S. to the port
- Ocean freight (container shipping to Rotterdam)
- Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
- The Rotterdam price
- Customs clearance service costs (agency in the Netherlands)
- Carrier delivery from the European port to your specified home address
- AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
Packages
No data
EquipmentNo detailed data / See the list below
Standard equipment
- Auto On/Off Projector Beam Led Low/High Beam w/Laser Supplement Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
- Black Grille w/Metal-Look Surround
- Black Side Windows Trim
- Body-Colored Door Handles
- Body-Colored Front Bumper w/Carbon Fiber Rub Strip/Fascia Accent
- Body-Colored Rear Bumper w/Carbon Fiber Rub Strip/Fascia Accent
- Carbon Fiber Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
- Fixed Rear Window w/Defroster
- Galvanized Steel/Aluminum/Composite Panels
- Headlights-Automatic Highbeams
- LED Brakelights
- Light Tinted Glass
- Lip Spoiler
- Perimeter/Approach Lights
- Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
- Tire Mobility Kit
- Tire Specific Low Tire Pressure Warning
- Tires: 275/35R20 Fr & 285/35R20 Rr Mixed Perf includes Non-runflat
- Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr M Y-Spoke includes Style 789M, Forged goldbronze
- Window Grid Diversity Antenna
- 10-Way Power Driver Seat includes Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement and Cushion Tilt
- 10-Way Power Passenger Seat includes Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement and Cushion Extension
- 5 12V DC Power Outlets
- Air Filtration
- Bucket Folding Bucket Front Facing Rear Seat
- Cargo Area Concealed Storage
- Cargo Features includes Tire Mobility Kit
- Cargo Space Lights
- Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
- Day-Night Auto-Dimming Rearview Mirror
- Delayed Accessory Power
- Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
- Driver Foot Rest
- Driver Information Center
- Fade-To-Off Interior Lighting
- Fixed Front Head Restraints and Fixed Rear Head Restraints
- Front And Rear Map Lights
- Front Center Armrest
- Front Cupholder
- Full Alcantara Simulated Suede Headliner
- Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
- Full Floor Console w/Covered Storage, Rear Console w/Storage and 5 12V DC Power Outlets
- Head-Up Display
- Heated Front Seats
- Illuminated Locking Glove Box
- Instrument Panel Covered Bin, Driver / Passenger And Rear Door Bins
- Interior Lock Disable
- Interior Trim includes Aluminum Instrument Panel Insert, Aluminum Door Panel Insert, Leather/Aluminum Console Insert, Metal-Look Interior Accents and Leather Upholstered Dashboard
- Leather/Metal-Look Gear Shifter Material
- M Carbon Bucket Seats includes power front seats
- Memory Settings includes Driver And Passenger Seats, Door Mirrors and Steering Wheel
- Merino Leather Door Trim Insert
- Outside Temp Gauge
- Power Fuel Flap Locking Type
- Power Tilt/Telescoping Steering Column
- Rear Cupholder
- Redundant Digital Speedometer
- Seats w/Carbon Fiber Back Material
- Sport Heated Alcantara Simulated Suede Steering Wheel w/Auto Tilt-Away
- Trunk Rear Cargo Access
- Trunk/Hatch Auto-Latch
- Valet Function
- 20.1 Gal. Fuel Tank
- 3.15 Axle Ratio
- 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control, Ceramic Discs and Electric Parking Brake
- Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
- Battery w/Run Down Protection
- Double Wishbone Front Suspension w/Coil Springs
- DSC Electronic Stability Control (ESC)
- Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
- Electric Power-Assist Speed-Sensing Steering
- Electro-Mechanical Limited Slip Differential
- Electronic Transfer Case
- Engine Auto Stop-Start Feature
- Engine Oil Cooler
- Front And Rear Anti-Roll Bars
- Gas-Pressurized Shock Absorbers
- M Traction Control ABS And Driveline Traction Control
- Multi-Link Rear Suspension w/Coil Springs
- Regenerative 249 Amp Alternator
- Transmission w/Driver Selectable Mode and M Steptronic Sequential Shift Control w/Steering Wheel Controls
- Active Blind Spot Detection Blind Spot
- Airbag Occupancy Sensor
- Collision Mitigation-Front
- Curtain 1st And 2nd Row Airbags
- Driver Monitoring-Alert
- Dual Stage Driver And Passenger Front Airbags
- Dual Stage Driver And Passenger Seat-Mounted Side Airbags
- Frontal Collision Warning w/City Collision Mitigation
- Immobilizer
- Lane Departure Warning
- Outboard Front Lap And Shoulder Safety Belts includes Pretensioners
- Park Distance Control Front And Rear Parking Sensors
- Perimeter Alarm
- Rear Child Safety Locks
- Rear Cross Traffic Alert
- Side Impact Beams
- Cruise Control w/Steering Wheel Controls
- FOB Controls includes Keyfob Cargo Access, Keyfob Window Activation and Keyfob Remote Start
- HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
- Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
- Power Door Locks w/Autolock Feature
- Power Rear Windows
- Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
- Rear HVAC w/Separate Controls
- Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
- Remote Releases includes Comfort Access Proximity Cargo Access
- Voice Activated Dual Zone Front And Rear Automatic Air Conditioning
- Wireless Charging
Podobne pojazdy BMW from the US
Idealny · 4.82026 BMW M5 Touring Wagon
- Przebieg
- 3410 mi
- Location
- NV - Manheim Nevada
- VIN
- WBS83GV05TCW76709
$129,788Zobacz ofertę
Idealny · 4.92026 BMW M5 Touring Wagon
- Przebieg
- 3024 mi
- Location
- PA - WEST CHESTER
- VIN
- WBS83GV06TCW68960
$127,209Zobacz ofertę
Idealny · 4.92025 BMW M5 Touring Wagon
- Przebieg
- 5064 mi
- Location
- PA - WEST CHESTER
- VIN
- WBS83GV03SCV75943
$125,455Zobacz ofertę
Idealny · 5.02025 BMW M5 Touring Wagon
- Przebieg
- 5590 mi
- Location
- TX - PLANO
- VIN
- WBS83GV09SCU62014
$122,500Zobacz ofertę
Idealny · 5.02027 BMW M5 Touring Wagon
- Przebieg
- 35 mi
- Location
- GA - Manheim Atlanta
- VIN
- WBS83GV01VCY06181
$140,000Zobacz ofertę
Idealny · 5.02025 BMW M5 Touring Wagon
- Przebieg
- 9369 mi
- Location
- TX - GRAPEVINE
- VIN
- WBS83GV07SCV24249
$118,500Zobacz ofertę
Idealny · 5.02026 BMW M5 Sedan
- Przebieg
- 9013 mi
- Location
- TX - HOUSTON
- VIN
- WBS83FK01TCV18270
$117,991Zobacz ofertę
Doskonały · 4.52026 BMW M5 Touring Wagon
- Przebieg
- 3384 mi
- Location
- NJ - Manheim New Jersey
- VIN
- WBS83GV09TCW75496
$116,000Zobacz ofertę
Idealny · 4.92025 BMW M5 Touring Wagon
- Przebieg
- 910 mi
- Location
- WA - Manheim Seattle
- VIN
- WBS83GV09SCU55824
$115,000Zobacz ofertę
Znakomity · 4.32026 BMW M5 Sedan
- Przebieg
- 7844 mi
- Location
- FL - West Palm Beach
- VIN
- WBS83FK08TCX56519
$113,000Zobacz ofertę
Idealny · 5.02026 BMW M5 Sedan
- Przebieg
- 2900 mi
- Location
- MI - TROY
- VIN
- WBS83FK08TCW82535
$113,000Zobacz ofertę
Idealny · 4.92025 BMW M5 Sedan
- Przebieg
- 4200 mi
- Location
- CO - COLORADO SPRINGS
- VIN
- WBS83FK01SCS90964
$110,000Zobacz ofertę
Idealny · 4.82026 BMW M5 Sedan
- Przebieg
- 16 243 mi
- Location
- NJ - Manheim NY Metro Skyline
- VIN
- WBS83FK04TCW08240
$109,900Zobacz ofertę
Doskonały · 4.62023 BMW M5 Sedan
- Przebieg
- 11 678 mi
- Location
- NJ - Manheim New Jersey
- VIN
- WBS83CH02PCL49405
$99,990Zobacz ofertę
Idealny · 5.02023 BMW M5 Sedan
- Przebieg
- 10 864 mi
- Location
- GA - Manheim Georgia
- VIN
- WBS83CH0XPCL88324
$86,975Zobacz ofertę
Doskonały · 4.62023 BMW M5 Sedan
- Przebieg
- 20 254 mi
- Location
- VA - FREDERICKSBURG
- VIN
- WBS83CH02PCM84058
$85,000Zobacz ofertę
Idealny · 5.02023 BMW M5 Sedan
- Przebieg
- 32 667 mi
- Location
- IL - NORTHBROOK
- VIN
- WBS83CH02PCN09556
$81,800Zobacz ofertę
Doskonały · 4.52023 BMW M5 Sedan
- Przebieg
- 19 054 mi
- Location
- CA - Manheim California
- VIN
- WBS83CH07PCN24831
$81,500Zobacz ofertę