Placing a purchase order is equivalent to granting us power of attorney to complete the transaction on the selected vehicle under the 'Buy Now' option on your behalf.
Twoja propozycja ceny
Import Calculator
Estimated costs
Price to RotterdamUSD
1. Vehicle value $109,800
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $650
5. Wysyłka morska z BRAK/DOMYŚLNY$675
Total to Rotterdam
$113,375~ 417 662 PLN
Destination costs (Europe)PLN
6. Transport Rotterdam -> Customer2 300 PLN
7. Duty and VAT (Estimated)46 400 PLN
8. AUTOMAX commission2 000 PLN
Total Landed Price (Gross)468 400,00 PLN
The door-to-door price covers all import costs. It does not include repairs or local excise tax.
* The exact location of the Manheim lot is not in the database. Logistics rates have been applied as defaults. Before purchasing, ask the administrator for an exact verification.
Clean title / No visible damage recorded in the system.
Documents
Title StatusCurrent
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
The vehicle's purchase value under the "Buy Now" system
AUTOMAX commission
Ground transport within the U.S. to the port
Ocean freight (container shipping to Rotterdam)
Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
The Rotterdam price
Customs clearance service costs (agency in the Netherlands)
Carrier delivery from the European port to your specified home address
AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Front Ventilated Seats, Interior Camera, Power Rear Sunshade & Rear Side Window Shades, Front & Rear Heated Seats, BMW Iconic Glow Kidney Grille, Parking Assistant Plus
Standard equipment
Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
Black Grille
Black Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
Black Side Windows Trim
Body-Colored Door Handles
Body-Colored Front Bumper w/Black Rub Strip/Fascia Accent
2-Way Power Driver Seat includes Power Cushion Extension
2-Way Power Passenger Seat includes Power Cushion Tilt
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Air Filtration
Cargo Area Concealed Storage
Cargo Features includes Tire Mobility Kit
Cargo Space Lights
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Day-Night Auto-Dimming Rearview Mirror
Delayed Accessory Power
Driver / Passenger And Rear Door Bins
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Driver Foot Rest
Driver Information Center
Fade-To-Off Interior Lighting
Front And Rear Map Lights
Front Center Armrest and Rear Center Armrest w/Storage
Full Alcantara Simulated Suede Headliner
Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
Full Floor Console w/Covered Storage and 1 12V DC Power Outlet
Head-Up Display
Heated Front Seats
Illuminated Front Cupholder
Illuminated Locking Glove Box
Interior Lock Disable
Interior Trim includes Aluminum Instrument Panel Insert, Aluminum Door Panel Insert, Piano Black Console Insert, Metal-Look Interior Accents and Merino Leather Upholstered Dashboard
M Multi-Function Seats includes lumbar support
Memory Settings includes Driver And Passenger Seats, Door Mirrors, Steering Wheel and Head Restraints
Merino Leather Door Trim Insert
Metal-Look Gear Shifter Material
Outside Temp Gauge
Power Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
Power Front Seats
Power Fuel Flap Locking Type
Power Tilt/Telescoping Steering Column
Rear Cupholder
Redundant Digital Speedometer
Sport Heated Leather Steering Wheel w/Auto Tilt-Away
Trunk/Hatch Auto-Latch
Valet Function
15.9 Gal. Fuel Tank
3.31 Axle Ratio
ABS And Driveline Traction Control
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Battery w/Run Down Protection
Double Wishbone Front Suspension w/Coil Springs
Electric Power-Assist Speed-Sensing Steering
Electro-Mechanical Limited Slip Differential
Electronic Stability Control (ESC)
Electronic Transfer Case
Engine Auto Stop-Start Feature
Engine Oil Cooler
Front And Rear Anti-Roll Bars
Gas-Pressurized Shock Absorbers
Hybrid Electric Motor
Lithium Ion (li-Ion) Traction Battery w/7.4 kW Onboard Charger and 4 Hrs Charge Time @ 220/240V
Regenerative 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
Transmission w/Driver Selectable Mode, M Steptronic Sequential Shift Control w/Steering Wheel Controls and Oil Cooler
Active Blind Spot Detection Blind Spot
Airbag Occupancy Sensor
Collision Mitigation-Front
Cross Traffic Warning (rear) with Brake Intervention
Curtain 1st And 2nd Row Airbags
Dual Stage Driver And Passenger Front Airbags
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Evasion Assist
Front Collision Mitigation with Left Turn Warning
Immobilizer
Lane Keeping Assistant/Lane Departure Warning Lane Departure Warning
Lane Keeping Assistant/Lane Departure Warning Lane Keeping Assist
Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
Park Distance Control Front And Rear Parking Sensors
Perimeter Alarm
Rear Child Safety Locks
Side Impact Beams
Cruise Control w/Steering Wheel Controls
FOB Controls includes Keyfob Cargo Access, Keyfob Window Activation and Keyfob Sunroof/Convertible Roof Activation
HVAC includes Underseat Ducts and Console Ducts
Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
Power Door Locks w/Autolock Feature
Power Rear Windows
Power Trunk Rear Cargo Access
Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
Rear HVAC w/Separate Controls
Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button
Remote Releases includes Comfort Access Proximity Cargo Access
Voice Activated Dual Zone Front And Rear Automatic Air Conditioning
Wireless Device Charging
Import pojazdu 2025 BMW M5 Sedan do Polski
Ten pojazd (2025 BMW M5 Sedan, VIN WBS83FK0XSCU19218) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 468 400 PLN.
We use cookies so the platform works correctly, to analyse traffic and to improve our U.S. car-import listings. You can find details in our Privacy Policy.