Placing a purchase order is equivalent to granting us power of attorney to complete the transaction on the selected vehicle under the 'Buy Now' option on your behalf.
Twoja propozycja ceny
Import Calculator
Estimated costs
Price to RotterdamUSD
1. Vehicle value $63,800
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $650
5. Wysyłka morska z BRAK/DOMYŚLNY$675
Total to Rotterdam
$67,375~ 248 203 PLN
Destination costs (Europe)PLN
6. Transport Rotterdam -> Customer2 300 PLN
7. Duty and VAT (Estimated)29 200 PLN
8. AUTOMAX commission2 000 PLN
Total Landed Price (Gross)281 700,00 PLN
The door-to-door price covers all import costs. It does not include repairs or local excise tax.
* The exact location of the Manheim lot is not in the database. Logistics rates have been applied as defaults. Before purchasing, ask the administrator for an exact verification.
Front Bumper - Multiple Scratches, Front Hood - Paint Chipped, Driver Quarter Panel - Heavy ScratchSmall Dent, Rear Bumper - Multiple Scratches
Documents
Title StatusCurrent
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
The vehicle's purchase value under the "Buy Now" system
AUTOMAX commission
Ground transport within the U.S. to the port
Ocean freight (container shipping to Rotterdam)
Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
The Rotterdam price
Customs clearance service costs (agency in the Netherlands)
Carrier delivery from the European port to your specified home address
AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
DRIVING ASSISTANCE PROFESSIONAL PACKAGE - ZDY
Active Driving Assistant Pro, Extended Traffic Jam Assistant, For limited access highways
Transmission w/Driver Selectable Mode and Oil Cooler
Airbag Occupancy Sensor
Blind Spot Detection Blind Spot
Collision Mitigation-Front
Driver And Passenger Side Airbag Head Extension, Driver And Passenger Knee Airbag
Driver Monitoring-Alert
Dual Stage Driver And Passenger Front Airbags
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Immobilizer
Lane Departure Warning
Outboard Front Lap And Shoulder Safety Belts includes Pretensioners
Park Distance Control Front And Rear Parking Sensors
Perimeter Alarm
Rear Collision Prevention
Side Impact Beams
Cruise Control w/Steering Wheel Controls
Dual Zone Front Automatic Air Conditioning
FOB Controls includes Keyfob Cargo Access, Keyfob Window Activation and Keyfob Sunroof/Convertible Roof Activation
HVAC includes Underseat Ducts and Console Ducts
Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
Power Door Locks w/Autolock Feature
Power Rear Windows
Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
Rear HVAC w/Separate Controls
Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button
Remote Releases includes Comfort Access Proximity Cargo Access
Import pojazdu 2022 BMW M4 Convertible Competition xDrive do Polski
Ten pojazd (2022 BMW M4 Convertible Competition xDrive, VIN WBS33BA06NCL01112) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 281 700 PLN.
We use cookies so the platform works correctly, to analyse traffic and to improve our U.S. car-import listings. You can find details in our Privacy Policy.