VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Updated: 01.08.2026
Status Live
Value
Scope $60,800 - $69,000
Average $64,900
Sale ends
Location TN - Manheim Nashville
Pickup At the Dealer
Highlights CR REPORT
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $65,300
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $1000
5. Ocean freight from SAVANNAH $675
Total to Rotterdam
$69,225 ~ 259 075 PLN
4.8
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score 96
Similar vehicles 92 - 97
Owners 4
Accidents 0
ANNOUNCEMENTS AND COMMENTS

Announcements

  • CLN CARFAX,EXEC PKG,19/20S

Damage notes

Front Bumper Cover - Chipped

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
EXECUTIVE PACKAGE - ZPX

WiFi Hotspot, complimentary 3-month or 3GB trial, Head-Up Display, Heated Steering Wheel, Power Tailgate, Gesture Control, Icon Adaptive LED Headlights w/Laserlight, Wireless Charging

PARKING ASSISTANCE PACKAGE - ZPK

Drive Recorder, Parking Assistant Plus

Standard equipment
  • Black Grille
  • Black Side Windows Trim and Black Front Windshield Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper
  • Body-Colored Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
  • Fixed Rear Window w/Defroster
  • Fixed Rear Windows
  • Forged Aluminum Wheels
  • Front License Plate Bracket
  • Galvanized Steel/Aluminum/Composite Panels
  • Headlights-Automatic Highbeams
  • Integrated Roof Antenna
  • LED Brakelights
  • Light Tinted Glass
  • Lip Spoiler
  • Perimeter/Approach Lights
  • Rocker Panel Extensions
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers
  • Tire Mobility Kit
  • Tire Specific Low Tire Pressure Warning
  • Wheels: 18" x 9.5" Fr/19" x 10.5" Rr M Double-Spk includes Style 824M, Orbit grey
  • 2-Way Power Driver Seat includes Power Seatback Side Bolster Support, Manual Cushion Extension and Power Rear Seat Easy Entry
  • 2-Way Power Passenger Seat includes Power Seatback Side Bolster Support, Manual Cushion Extension and Power Rear Seat Easy Entry
  • 3 12V DC Power Outlets
  • 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
  • Air Filtration
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Space Lights
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Compass
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Driver And Passenger Heated Front Seat
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror
  • Driver Foot Rest
  • Driver Information Center
  • Fade-To-Off Interior Lighting
  • Front And Rear Map Lights
  • Front Center Armrest and Rear Center Armrest
  • Front Cupholder
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Cloth Headliner
  • Full Floor Console w/Covered Storage, Mini Overhead Console and 3 12V DC Power Outlets
  • Illuminated Locking Glove Box
  • Instrument Panel Covered Bin, Driver And Passenger Door Bins
  • Interior Trim includes Aluminum Instrument Panel Insert, Aluminum Console Insert and Metal-Look Interior Accents
  • Leather/Metal-Look Gear Shifter Material
  • Leatherette Door Trim Insert
  • Lumbar Support
  • M Sport Seats includes Heated Front Seats
  • Manual Adjustable Front Head Restraints and Fixed Rear Head Restraints
  • Manual Tilt/Telescoping Steering Column
  • Memory Settings includes Driver Seat and Door Mirrors
  • Outside Temp Gauge
  • Power Front Seats
  • Power Fuel Flap Locking Type
  • Rear Cupholder
  • Redundant Digital Speedometer
  • Sport Leather/Metal-Look Steering Wheel
  • Trunk Rear Cargo Access
  • Valet Function
  • 15.6 Gal. Fuel Tank
  • 3.46 Axle Ratio
  • 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
  • 70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
  • ABS And Driveline Traction Control
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • DSC Electronic Stability Control (ESC)
  • Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • Multi-Link Rear Suspension w/Coil Springs
  • Regenerative Alternator
  • Strut Front Suspension w/Coil Springs
  • Transmission w/Driver Selectable Mode
  • Airbag Occupancy Sensor
  • Blind Spot Detection Blind Spot
  • Collision Mitigation-Front
  • Curtain 1st And 2nd Row Airbags
  • Driver And Passenger Knee Airbag
  • Driver Monitoring-Alert
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Immobilizer
  • Lane Departure Warning
  • Outboard Front Lap And Shoulder Safety Belts includes Pretensioners
  • Park Distance Control Front And Rear Parking Sensors
  • Perimeter Alarm
  • Rear Collision Prevention
  • Side Impact Beams
  • Cruise Control w/Steering Wheel Controls
  • Dual Zone Front Automatic Air Conditioning
  • FOB Controls includes Keyfob Cargo Access and Keyfob Window Activation
  • HVAC includes Underseat Ducts and Console Ducts
  • Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
  • Rear HVAC w/Separate Controls
  • Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button
  • Remote Releases includes Comfort Access Proximity Cargo Access
  • BLACK, EXTENDED MERINO LEATHER UPHOLSTERY
  • CARBON FIBER TRIM
  • M COMPOUND BRAKES W/BLACK CALIPERS
  • WHEELS: 19" X 9.5" FR/20" X 10.5" RR (STYLE 826M)

Import pojazdu 2021 BMW M4 Coupe do Polski

Ten pojazd (2021 BMW M4 Coupe, VIN WBS53AZ02MCG71224) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 293 700 PLN.

Podobne pojazdy BMW from the US

2024 BMW M4 Convertible Competition xDriveZnakomity · 4.2
2024 BMW M4 Convertible Competition xDrive
Przebieg
21 720 mi
Location
NY - LONG ISLAND CITY
VIN
WBS33BA02RCR80625
$65,500Zobacz ofertę
2021 BMW M4 CoupeIdealny · 5.0
2021 BMW M4 Coupe
Przebieg
26 847 mi
Location
FL - Manheim Orlando
VIN
WBS53AZ02MCH16825
$65,000Zobacz ofertę
2022 BMW M4 CoupeIdealny · 5.0
2022 BMW M4 Coupe
Przebieg
22 990 mi
Location
MI - WALLED LAKE
VIN
WBS53AZ07NCJ97026
$65,000Zobacz ofertę
2022 BMW M4 Coupe Competition xDriveIdealny · 4.8
2022 BMW M4 Coupe Competition xDrive
Przebieg
50 297 mi
Location
OH - COLUMBUS
VIN
WBS43AZ04NCH75517
$64,900Zobacz ofertę
2027 BMW 4 Series Coupe M440i xDriveIdealny · 4.7
2027 BMW 4 Series Coupe M440i xDrive
Przebieg
6524 mi
Location
CA - Hayward
VIN
WBA83DA04VCX77347
$64,500Zobacz ofertę
2027 BMW 4 Series Coupe M440i xDriveDoskonały · 4.4
2027 BMW 4 Series Coupe M440i xDrive
Przebieg
6512 mi
Location
NC - Statesville
VIN
WBA83DA03VCX80269
$64,500Zobacz ofertę
2027 BMW 4 Series Coupe M440i xDriveDoskonały · 4.4
2027 BMW 4 Series Coupe M440i xDrive
Przebieg
6428 mi
Location
GA - College Park
VIN
WBA83DA07VCX79481
$64,500Zobacz ofertę
2027 BMW 4 Series Coupe M440i xDriveDoskonały · 4.6
2027 BMW 4 Series Coupe M440i xDrive
Przebieg
6608 mi
Location
NY - Newburgh
VIN
WBA83DA04VCX83763
$64,500Zobacz ofertę
2027 BMW 4 Series Coupe M440i xDriveDoskonały · 4.6
2027 BMW 4 Series Coupe M440i xDrive
Przebieg
8406 mi
Location
TX - Dallas
VIN
WBA83DA09VCX77442
$64,500Zobacz ofertę
2024 BMW M4 Convertible Competition xDriveIdealny · 5.0
2024 BMW M4 Convertible Competition xDrive
Przebieg
41 074 mi
Location
IL - WESTMONT
VIN
WBS33BA05RCP54241
$64,500Zobacz ofertę
2023 BMW M4 Coupe Competition xDriveDoskonały · 4.5
2023 BMW M4 Coupe Competition xDrive
Przebieg
52 611 mi
Location
CA - SOUTH EL MONTE
VIN
WBS43AZ04PCL56762
$66,500Zobacz ofertę
2024 BMW M4 Coupe Competition xDriveIdealny · 4.9
2024 BMW M4 Coupe Competition xDrive
Przebieg
63 596 mi
Location
CA - Manheim Riverside
VIN
WBS43AZ07RCR99660
$66,500Zobacz ofertę
2024 BMW M4 Coupe CompetitionDobry · 2.9
2024 BMW M4 Coupe Competition
Przebieg
50 339 mi
Location
FL - LAKELAND
VIN
WBS33AZ08RCN36485
$63,700Zobacz ofertę
2025 BMW M4 CoupeIdealny · 5.0
2025 BMW M4 Coupe
Przebieg
25 448 mi
Location
NY - BELLEROSE
VIN
WBS13HK09SCT52091
$66,995Zobacz ofertę
2021 BMW M4 CoupeDoskonały · 4.6
2021 BMW M4 Coupe
Przebieg
24 290 mi
Location
HI - Manheim Hawaii
VIN
WBS53AZ01MCG66659
$67,000Zobacz ofertę
2022 BMW M4 Coupe CompetitionDoskonały · 4.4
2022 BMW M4 Coupe Competition
Przebieg
22 550 mi
Location
IL - MIDLOTHIAN
VIN
WBS33AZ08NCJ63927
$67,500Zobacz ofertę
2022 BMW M4 Convertible Competition xDriveZnakomity · 4.1
2022 BMW M4 Convertible Competition xDrive
Przebieg
19 671 mi
Location
FL - Manheim Fort Lauderdale
VIN
WBS33BA06NCL04821
$62,999Zobacz ofertę
2023 BMW M4 Coupe CompetitionZnakomity · 4.2
2023 BMW M4 Coupe Competition
Przebieg
32 110 mi
Location
FL - DAVIE
VIN
WBS33AZ02PCM96336
$62,500Zobacz ofertę