2017 BMW M3 Sedan
Listed as: 2017 BMW M3 Sedan
WBS8M9C53H5G84801
•
77,304 mil
•
RWD
•
3.0L 6 Cyl Turbo Gasoline Man
•
Gasoline/Other
•
Auto
ALL
26
Limited-time offer
Updated: 11.08.2026
Status
Sold
Value
Scope
$35,900 - $41,700
Average
$38,800
Location
NJ - WAYNE
Pickup
At the Dealer
Seller
The Car House Of Wayne Llc
Highlights
CR REPORT
Sold for:
$50,900
Import Calculator
Estimated costs
Price to Rotterdam
USD
1. Vehicle value
$50,900
2. Auction fee
$1,750
3. Service fee
$500
4. Ground transport
$650
5. Wysyłka morska z BRAK/DOMYŚLNY
$675
Total to Rotterdam
$54,475
~ 200 680 PLN
* The exact location of the Manheim lot is not in the database. Logistics rates have been applied as defaults. Before purchasing, ask the administrator for an exact verification.
4.5
Auto
G
rade
Average
Drives
Starts
Interior odor
Key1
Key fob?
Vehicle History
ANNOUNCEMENTS AND COMMENTS
Announcements
- No additional announcements
Damage notes
Clean title / No visible damage recorded in the system.
Documents
Title Status
Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
- The vehicle's purchase value under the "Buy Now" system
- AUTOMAX commission
- Ground transport within the U.S. to the port
- Ocean freight (container shipping to Rotterdam)
- Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
- The Rotterdam price
- Customs clearance service costs (agency in the Netherlands)
- Carrier delivery from the European port to your specified home address
- AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
Packages
No data
EquipmentNo detailed data / See the list below
Standard equipment
- Auto On/Off Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
- Black Grille w/Chrome Surround
- Black Side Windows Trim and Black Front Windshield Trim
- Body-Colored Door Handles
- Body-Colored Front Bumper
- Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
- Body-Colored Rear Bumper
- Fixed Rear Window w/Defroster
- Front Windshield includes Sun Visor Strip
- Galvanized Steel/Aluminum/Composite Panels
- LED Brakelights
- Light Tinted Glass
- Lip Spoiler
- Perimeter/Approach Lights
- Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
- Tire Mobility Kit
- Tire Specific Low Tire Pressure Warning
- Wheels w/Silver Accents
- Window Grid Diversity Antenna
- 10-Way Power Driver Seat includes Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt and Manual Cushion Extension
- 10-Way Power Passenger Seat includes Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt and Manual Cushion Extension
- 2 Seatback Storage Pockets
- 4 12V DC Power Outlets
- 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
- Air Filtration
- Analog Appearance
- Cargo Area Concealed Storage
- Cargo Features includes Tire Mobility Kit
- Cargo Net
- Cargo Space Lights
- Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
- Day-Night Auto-Dimming Rearview Mirror
- Delayed Accessory Power
- Driver / Passenger And Rear Door Bins
- Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
- Driver Foot Rest
- Driver Information Center
- Fade-To-Off Interior Lighting
- Fixed Front Head Restraints and Manual Adjustable Rear Head Restraints
- Front And Rear Map Lights
- Front Cupholder
- Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
- Full Cloth Headliner
- Full Floor Console w/Covered Storage and 4 12V DC Power Outlets
- Heated Front Sport Seats includes lumbar support
- Illuminated Locking Glove Box
- Interior Lock Disable
- Interior Trim includes Carbon Fiber Instrument Panel Insert, Carbon Fiber Console Insert and Metal-Look Interior Accents
- Leather/Metal-Look Gear Shifter Material
- Leatherette Door Trim Insert
- Manual Tilt/Telescoping Steering Column
- Memory Settings includes Driver Seat and Door Mirrors
- Outside Temp Gauge
- Power Fuel Flap Locking Type
- Rear Cupholder
- Remote Releases includes Power Cargo Access
- Sliding Front Center Armrest and Rear Center Armrest w/Pass-Thru
- Sport Leather Steering Wheel
- Trunk Rear Cargo Access
- Valet Function
- 15.9 Gal. Fuel Tank
- 3.46 Axle Ratio
- 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control
- 90-Amp/Hr 900CCA Maintenance-Free Battery
- ABS And Driveline Traction Control
- Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
- Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
- Electric Power-Assist Speed-Sensing Steering
- Electro-Mechanical Limited Slip Differential
- Electronic Stability Control (ESC)
- Engine Auto Stop-Start Feature
- Engine Oil Cooler
- Front And Rear Anti-Roll Bars
- Gas-Pressurized Shock Absorbers
- Multi-Link Rear Suspension w/Coil Springs
- Regenerative 210 Amp Alternator
- Strut Front Suspension w/Coil Springs
- Airbag Occupancy Sensor
- Curtain 1st And 2nd Row Airbags
- Driver And Passenger Knee Airbag
- Dual Stage Driver And Passenger Front Airbags
- Dual Stage Driver And Passenger Seat-Mounted Side Airbags
- Immobilizer
- Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
- Perimeter Alarm
- Rear Child Safety Locks
- Side Impact Beams
- Cruise Control w/Steering Wheel Controls
- Dual Zone Front Automatic Air Conditioning
- FOB Controls includes Keyfob Cargo Access, Keyfob Window Activation and Keyfob Sunroof/Convertible Roof Activation
- HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
- Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
- Power Door Locks w/Autolock Feature
- Power Rear Windows
- Proximity Key For Doors And Push Button Start
- Rear HVAC w/Separate Controls
- Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
- Tailgate/Rear Door Lock Included w/Power Door Locks
- ALUMINUM BLADE INTERIOR TRIM
- MOONROOF
- SAKHIR ORANGE/BLACK, EXTENDED MERINO LEATHER SEAT UPHOLSTERY
- WHEELS: 19" X 9" FR & 19" X 10" RR BLK
Podobne pojazdy BMW from the US
Doskonały · 4.42026 BMW 3 Series Sedan M340i NA
- Przebieg
- 7261 mi
- Location
- FL - Manheim Tampa
- VIN
- 3MW59FT09T8F97974
$51,000Zobacz ofertę
Znakomity · 4.12018 BMW M3 Sedan
- Przebieg
- 53 034 mi
- Location
- PA - Manheim Pennsylvania
- VIN
- WBS8M9C5XJ5K99206
$52,002Zobacz ofertę
Idealny · 5.02023 BMW 3 Series Sedan M340i
- Przebieg
- 35 422 mi
- Location
- FL - BROOKSVILLE
- VIN
- 3MW49FS08P8D07467
$49,000Zobacz ofertę
Idealny · 5.02015 BMW M3 Sedan
- Przebieg
- 33 780 mi
- Location
- TX - CARROLLTON
- VIN
- WBS3C9C51FP805000
$52,888Zobacz ofertę
Doskonały · 4.52018 BMW M3 Sedan
- Przebieg
- 54 123 mi
- Location
- CA - Manheim California
- VIN
- WBS8M9C59J5L71982
$53,000Zobacz ofertę
Znakomity · 4.22026 BMW 3 Series Sedan M340i
- Przebieg
- 6626 mi
- Location
- TN - Mt. Juliet
- VIN
- WBA53FT02TFW64309
$53,500Zobacz ofertę
Znakomity · 4.32026 BMW 3 Series Sedan M340i
- Przebieg
- 6621 mi
- Location
- FL - Ocoee
- VIN
- WBA53FT0XTFW64302
$53,700Zobacz ofertę
Very Good · 3.62018 BMW M3 Sedan
- Przebieg
- 30 779 mi
- Location
- FL - Manheim Orlando
- VIN
- WBS8M9C54J5L71730
$48,000Zobacz ofertę
Znakomity · 4.12018 BMW M3 Sedan
- Przebieg
- 42 953 mi
- Location
- NJ - TRENTON
- VIN
- WBS8M9C52J5J80131
$48,000Zobacz ofertę
Doskonały · 4.42018 BMW M3 Sedan
- Przebieg
- 70 513 mi
- Location
- NY - BAYSIDE
- VIN
- WBS8M9C52J5L72021
$47,995Zobacz ofertę
Doskonały · 4.42026 BMW 3 Series Sedan M340i
- Przebieg
- 6542 mi
- Location
- FL - Ocoee
- VIN
- WBA53FT0XTFW69029
$54,000Zobacz ofertę
Znakomity · 4.12026 BMW 3 Series Sedan M340i
- Przebieg
- 5995 mi
- Location
- TX - Dallas
- VIN
- WBA53FT09TFW62976
$54,100Zobacz ofertę
Doskonały · 4.52026 BMW 3 Series Sedan M340i
- Przebieg
- 6606 mi
- Location
- TX - Houston
- VIN
- WBA53FT03TFW62083
$54,400Zobacz ofertę
Idealny · 4.72026 BMW X2 Sports Activity Coupe M35i
- Przebieg
- 6433 mi
- Location
- IL - Matteson
- VIN
- WBX83GM04T5634788
$47,400Zobacz ofertę
Idealny · 4.92017 BMW M3 Sedan
- Przebieg
- 37 134 mi
- Location
- NY - ELMONT
- VIN
- WBS8M9C50H5G42165
$54,500Zobacz ofertę
Idealny · 4.82026 BMW X2 Sports Activity Coupe M35i
- Przebieg
- 6409 mi
- Location
- AZ - Tolleson
- VIN
- WBX83GM07T5638379
$47,300Zobacz ofertę
Idealny · 4.82026 BMW X2 Sports Activity Coupe M35i
- Przebieg
- 6774 mi
- Location
- FL - West Palm Beach
- VIN
- WBX83GM05T5631527
$47,200Zobacz ofertę
Idealny · 4.72026 BMW X2 Sports Activity Coupe M35i
- Przebieg
- 6531 mi
- Location
- FL - West Palm Beach
- VIN
- WBX83GM03T5623247
$47,200Zobacz ofertę