VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Updated: 20.08.2026
Status Live
Value
Scope $40,300 - $45,500
Average $42,900
Sale ends
Location TX - CARROLLTON
Pickup At the Dealer
Highlights CR REPORT
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $52,888
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $820
5. Ocean freight from HOUSTON $695
Total to Rotterdam
$56,653 ~ 208 704 PLN
5.0
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score 95
Similar vehicles 83 - 90
Owners 2
Accidents 0
ANNOUNCEMENTS AND COMMENTS

Announcements

  • No additional announcements

Damage notes

Clean title / No visible damage recorded in the system.

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
EXECUTIVE PACKAGE - ZEC

Heated Rear Seats, Comfort Access Keyless Entry, Head-Up Display, Heated Steering Wheel, Satellite Radio w/1 Year Subscription, Retractable Headlight Washers, Rear View Camera, Park Distance Control

Standard equipment
  • Auto On/Off Projector Beam High Intensity Low/High Beam Daytime Running Auto-Leveling Directionally Adaptive Headlamps w/Delay-Off
  • Black Grille w/Chrome Surround
  • Black Side Windows Trim and Black Front Windshield Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper
  • Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
  • Body-Colored Rear Bumper
  • Fixed Rear Window w/Defroster
  • Front Windshield includes Sun Visor Strip
  • Galvanized Steel/Aluminum/Composite Panels
  • Light Tinted Glass
  • Lip Spoiler
  • Perimeter/Approach Lights
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
  • Tire Mobility Kit
  • Tire Specific Low Tire Pressure Warning
  • Wheels w/Silver Accents
  • Window Grid Diversity Antenna
  • 2 Seatback Storage Pockets
  • 2-Way Power Driver Seat includes Power Seatback Side Bolster Support and Manual Cushion Extension
  • 2-Way Power Passenger Seat includes Power Seatback Side Bolster Support and Manual Cushion Extension
  • 4 12V DC Power Outlets
  • 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
  • Air Filtration
  • Analog Appearance
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Net
  • Cargo Space Lights
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Driver / Passenger And Rear Door Bins
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
  • Driver Foot Rest
  • Driver Information Center
  • Fade-To-Off Interior Lighting
  • Fixed Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Front And Rear Map Lights
  • Front Cupholder
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Cloth Headliner
  • Full Floor Console w/Covered Storage and 4 12V DC Power Outlets
  • Heated Front Sport Seats includes lumbar support
  • Illuminated Locking Glove Box
  • Interior Lock Disable
  • Interior Trim includes Carbon Fiber Instrument Panel Insert, Carbon Fiber Console Insert and Metal-Look Interior Accents
  • Leather/Metal-Look Gear Shifter Material
  • Leatherette Door Trim Insert
  • Manual Tilt/Telescoping Steering Column
  • Memory Settings includes Driver Seat and Door Mirrors
  • Outside Temp Gauge
  • Power Fuel Flap Locking Type
  • Rear Cupholder
  • Remote Releases includes Power Cargo Access
  • Sliding Front Center Armrest and Rear Center Armrest w/Pass-Thru
  • Sport Leather Steering Wheel
  • Trunk Rear Cargo Access
  • Valet Function
  • 15.9 Gal. Fuel Tank
  • 3.46 Axle Ratio
  • 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control
  • 90-Amp/Hr 900CCA Maintenance-Free Battery
  • ABS And Driveline Traction Control
  • Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Electronic Stability Control (ESC)
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • Multi-Link Rear Suspension w/Coil Springs
  • Regenerative 210 Amp Alternator
  • Sport Tuned Suspension
  • Strut Front Suspension w/Coil Springs
  • Airbag Occupancy Sensor
  • Curtain 1st And 2nd Row Airbags
  • Driver And Passenger Knee Airbag
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Immobilizer
  • Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
  • Perimeter Alarm
  • Rear Child Safety Locks
  • Side Impact Beams
  • Cruise Control w/Steering Wheel Controls
  • Dual Zone Front Automatic Air Conditioning
  • FOB Controls includes Keyfob Cargo Access, Keyfob Window Activation and Keyfob Sunroof/Convertible Roof Activation
  • HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
  • Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Power Rear Windows
  • Proximity Key For Push Button Start Only
  • Rear HVAC w/Separate Controls
  • Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
  • Tailgate/Rear Door Lock Included w/Power Door Locks

Import pojazdu 2015 BMW M3 Sedan do Polski

Ten pojazd (2015 BMW M3 Sedan, VIN WBS3C9C51FP805000) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 238 200 PLN.

Podobne pojazdy BMW from the US

2018 BMW M3 SedanDoskonały · 4.5
2018 BMW M3 Sedan
Przebieg
54 123 mi
Location
CA - Manheim California
VIN
WBS8M9C59J5L71982
$53,000Zobacz ofertę
2026 BMW 3 Series Sedan M340iZnakomity · 4.2
2026 BMW 3 Series Sedan M340i
Przebieg
6626 mi
Location
TN - Mt. Juliet
VIN
WBA53FT02TFW64309
$53,500Zobacz ofertę
2026 BMW 3 Series Sedan M340iZnakomity · 4.3
2026 BMW 3 Series Sedan M340i
Przebieg
6621 mi
Location
FL - Ocoee
VIN
WBA53FT0XTFW64302
$53,700Zobacz ofertę
2018 BMW M3 SedanZnakomity · 4.1
2018 BMW M3 Sedan
Przebieg
53 034 mi
Location
PA - Manheim Pennsylvania
VIN
WBS8M9C5XJ5K99206
$52,002Zobacz ofertę
2026 BMW 3 Series Sedan M340iDoskonały · 4.4
2026 BMW 3 Series Sedan M340i
Przebieg
6542 mi
Location
FL - Ocoee
VIN
WBA53FT0XTFW69029
$54,000Zobacz ofertę
2026 BMW 3 Series Sedan M340iZnakomity · 4.1
2026 BMW 3 Series Sedan M340i
Przebieg
5995 mi
Location
TX - Dallas
VIN
WBA53FT09TFW62976
$54,100Zobacz ofertę
2026 BMW 3 Series Sedan M340iDoskonały · 4.5
2026 BMW 3 Series Sedan M340i
Przebieg
6606 mi
Location
TX - Houston
VIN
WBA53FT03TFW62083
$54,400Zobacz ofertę
2017 BMW M3 SedanIdealny · 4.9
2017 BMW M3 Sedan
Przebieg
37 134 mi
Location
NY - ELMONT
VIN
WBS8M9C50H5G42165
$54,500Zobacz ofertę
2026 BMW 3 Series Sedan M340i NADoskonały · 4.4
2026 BMW 3 Series Sedan M340i NA
Przebieg
7261 mi
Location
FL - Manheim Tampa
VIN
3MW59FT09T8F97974
$51,000Zobacz ofertę
2023 BMW 3 Series Sedan M340i xDriveZnakomity · 4.3
2023 BMW 3 Series Sedan M340i xDrive
Przebieg
30 371 mi
Location
NY - WESTBURY
VIN
3MW49FF00P8D42806
$54,800Zobacz ofertę
2017 BMW M3 SedanDoskonały · 4.5
2017 BMW M3 Sedan
Przebieg
77 304 mi
Location
NJ - WAYNE
VIN
WBS8M9C53H5G84801
$50,900Zobacz ofertę
2026 BMW 3 Series Sedan M340iIdealny · 4.9
2026 BMW 3 Series Sedan M340i
Przebieg
7141 mi
Location
TX - Houston
VIN
WBA53FT06TFW59744
$54,900Zobacz ofertę
2018 BMW M3 SedanIdealny · 4.8
2018 BMW M3 Sedan
Przebieg
44 465 mi
Location
WI - WAUKESHA
VIN
WBS8M9C59J5J77954
$54,900Zobacz ofertę
2018 BMW M3 SedanWyróżniający się · 4.0
2018 BMW M3 Sedan
Przebieg
48 871 mi
Location
GA - Manheim Georgia
VIN
WBS8M9C58J5K98782
$55,000Zobacz ofertę
2005 BMW M3 CoupeDoskonały · 4.6
2005 BMW M3 Coupe
Przebieg
19 677 mi
Location
VA - FAIRFAX
VIN
WBSBL93435PN60301
$55,000Zobacz ofertę
2026 BMW 3 Series Sedan M340iDoskonały · 4.5
2026 BMW 3 Series Sedan M340i
Przebieg
6401 mi
Location
PA - Manheim
VIN
WBA53FT05TFW59914
$55,000Zobacz ofertę
1999 BMW M3 CoupeZnakomity · 4.1
1999 BMW M3 Coupe
Przebieg
162 545 mi
Location
MD - COCKEYSVILLE
VIN
WBSBG9334XEY83122
$55,900Zobacz ofertę
2026 BMW 3 Series Sedan M340i xDrive NAIdealny · 4.7
2026 BMW 3 Series Sedan M340i xDrive NA
Przebieg
6697 mi
Location
FL - MIAMI
VIN
3MW69FT03T8F95643
$56,000Zobacz ofertę