VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Updated: 22.07.2026
Status Sold
Value
Scope $63,100 - $69,600
Average $66,400
Location PA - Manheim Pennsylvania
Pickup At the Dealer
Highlights CR REPORT
Sold for: $72,805
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $72,805
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $820
5. Ocean freight from NEW YORK $675
Total to Rotterdam
$76,550 ~ 286 488 PLN
1.4
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score 95
Similar vehicles 91 - 96
Owners 1
Accidents 0
ANNOUNCEMENTS AND COMMENTS

Announcements

  • AS IS;INOP

Damage notes

Windshield - Cracked/Cut, Front Bumper Reinforcement - Bent, Front Bumper Cover - Broken, Front Grille - Broken, Lower Engine Splash Shield / Skid Plate - Broken, Front Grille - Broken, Hood - Severe Damage, Left Fender - Dent(s), Left Front Wheel - Scratches, Left Headlight - Broken, Left Qtr Panel - Dent(s), Left Rear Wheel - Scratches, Left Rear Tire - Worn/Stained, Right Rear Tire - Worn/Stained, Right Headlight - Broken, Right Front Marker Light - Broken, Right Rocker Panel Molding - Broken, Right Front Door Molding - Broken, Right Fender - Dent(s), Right Front Wheel - Scratches, Warning - Tire Pressure - On, Warning - Engine - On, Front Subframe - Broken, Right Front Rail/Unirail Extension - Broken, Radiator - Broken, A/C Condensor - Broken, Drive Battery Charging Cable - Missing

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
EXECUTIVE PACKAGE - ZPX

Front Ventilated Seats, Interior Camera, Power Rear Sunshade & Rear Side Window Shades, Front & Rear Heated Seats, BMW Iconic Glow Kidney Grille, Parking Assistant Plus

Standard equipment
  • Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
  • Black Grille
  • Black Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
  • Black Side Windows Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper w/Black Rub Strip/Fascia Accent
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
  • Cornering Lights
  • Fixed Glass Sky Lounge Panoramic 1st And 2nd Row Sunroof w/Power Sunshade
  • Fixed Rear Window w/Defroster
  • Galvanized Steel/Aluminum Panels
  • Headlights-Automatic Highbeams
  • LED Brakelights
  • Light Tinted Glass
  • Lip Spoiler
  • Perimeter/Approach Lights
  • Side Impact Beams
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
  • Tire Mobility Kit
  • Tire Specific Low Tire Pressure Warning
  • Tires: 285/40R20 Front & 295/35R21 Rear includes Staggered high performance
  • Window Grid Diversity Antenna
  • 1 12V DC Power Outlet
  • 2-Way Power Driver Seat includes Power Cushion Extension
  • 2-Way Power Passenger Seat includes Power Cushion Tilt
  • 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
  • Air Filtration
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Space Lights
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Driver / Passenger And Rear Door Bins
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
  • Driver Foot Rest
  • Driver Information Center
  • Fade-To-Off Interior Lighting
  • Front And Rear Map Lights
  • Front Center Armrest and Rear Center Armrest w/Storage
  • Full Alcantara Simulated Suede Headliner
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Floor Console w/Covered Storage and 1 12V DC Power Outlet
  • Head-Up Display
  • Heated Front Seats
  • Illuminated Front Cupholder
  • Illuminated Locking Glove Box
  • Interior Lock Disable
  • Interior Trim includes Aluminum Instrument Panel Insert, Aluminum Door Panel Insert, Piano Black Console Insert, Metal-Look Interior Accents and Merino Leather Upholstered Dashboard
  • M Multi-Function Seats includes lumbar support
  • Memory Settings includes Driver And Passenger Seats, Door Mirrors, Steering Wheel and Head Restraints
  • Merino Leather Door Trim Insert
  • Metal-Look Gear Shifter Material
  • Outside Temp Gauge
  • Power Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Power Front Seats
  • Power Fuel Flap Locking Type
  • Power Tilt/Telescoping Steering Column
  • Rear Cupholder
  • Redundant Digital Speedometer
  • Sport Heated Leather Steering Wheel w/Auto Tilt-Away
  • Trunk/Hatch Auto-Latch
  • Valet Function
  • 15.9 Gal. Fuel Tank
  • 3.31 Axle Ratio
  • ABS And Driveline Traction Control
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • Battery w/Run Down Protection
  • Double Wishbone Front Suspension w/Coil Springs
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Electronic Stability Control (ESC)
  • Electronic Transfer Case
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • Hybrid Electric Motor
  • Lithium Ion (li-Ion) Traction Battery w/7.4 kW Onboard Charger and 4 Hrs Charge Time @ 220/240V
  • Multi-Link Rear Suspension w/Coil Springs
  • Quasi-Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
  • Regenerative 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
  • Transmission w/Driver Selectable Mode, M Steptronic Sequential Shift Control w/Steering Wheel Controls and Oil Cooler
  • Active Blind Spot Detection Blind Spot
  • Airbag Occupancy Sensor
  • Collision Mitigation-Front
  • Cross Traffic Warning (rear) with Brake Intervention
  • Curtain 1st And 2nd Row Airbags
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Evasion Assist
  • Front Collision Mitigation with Left Turn Warning
  • Immobilizer
  • Lane Keeping Assistant/Lane Departure Warning Lane Departure Warning
  • Lane Keeping Assistant/Lane Departure Warning Lane Keeping Assist
  • Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
  • Park Distance Control Front And Rear Parking Sensors
  • Perimeter Alarm
  • Rear Child Safety Locks
  • Cruise Control w/Steering Wheel Controls
  • FOB Controls includes Keyfob Cargo Access, Keyfob Window Activation and Keyfob Sunroof/Convertible Roof Activation
  • HVAC includes Underseat Ducts and Console Ducts
  • Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Power Rear Windows
  • Power Trunk Rear Cargo Access
  • Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
  • Rear HVAC w/Separate Controls
  • Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button
  • Remote Releases includes Comfort Access Proximity Cargo Access
  • Voice Activated Dual Zone Front And Rear Automatic Air Conditioning
  • Wireless Device Charging

Podobne pojazdy BMW from the US

2023 BMW M5 SedanZnakomity · 4.2
2023 BMW M5 Sedan
Przebieg
19 944 mi
Location
NJ - Manheim NY Metro Skyline
VIN
WBS83CH04PCN51050
$77,900Zobacz ofertę
2023 BMW M5 SedanDoskonały · 4.6
2023 BMW M5 Sedan
Przebieg
38 847 mi
Location
OR - SALEM
VIN
WBS83CH00PCM47266
$78,400Zobacz ofertę
2019 BMW M5 COMPETITIODoskonały · 4.6
2019 BMW M5 COMPETITIO
Przebieg
34 101 mi
Location
PA - HATFIELD
VIN
WBSJF0C59KB448618
$79,800Zobacz ofertę
2021 BMW X7 M50IIdealny · 4.8
2021 BMW X7 M50I
Przebieg
49 009 mi
Location
PA - HATFIELD
VIN
5UXCX6C0XM9E82387
$65,800Zobacz ofertę
2023 BMW M5 SedanVery Good · 3.7
2023 BMW M5 Sedan
Przebieg
16 394 mi
Location
OK - NORMAN
VIN
WBS83CH01PCN01383
$80,600Zobacz ofertę
2023 BMW M5 SedanDoskonały · 4.4
2023 BMW M5 Sedan
Przebieg
50 032 mi
Location
NJ - Manheim NY Metro Skyline
VIN
WBS83CH02PCL17666
$65,000Zobacz ofertę
2023 BMW M5 SedanDoskonały · 4.5
2023 BMW M5 Sedan
Przebieg
19 054 mi
Location
CA - Manheim California
VIN
WBS83CH07PCN24831
$81,500Zobacz ofertę
2023 BMW M5 SedanIdealny · 5.0
2023 BMW M5 Sedan
Przebieg
32 667 mi
Location
IL - NORTHBROOK
VIN
WBS83CH02PCN09556
$81,800Zobacz ofertę
2023 BMW X6 Sports Activity Coupe M50iIdealny · 4.8
2023 BMW X6 Sports Activity Coupe M50i
Przebieg
23 377 mi
Location
CA - ROSEMEAD
VIN
5UXCY8C02P9R20538
$63,300Zobacz ofertę
2021 BMW M5 SedanIdealny · 4.8
2021 BMW M5 Sedan
Przebieg
46 405 mi
Location
CA - Manheim San Francisco Bay
VIN
WBS83CH09MCG44080
$63,000Zobacz ofertę
2019 BMW M5 SedanIdealny · 4.9
2019 BMW M5 Sedan
Przebieg
24 359 mi
Location
FL - OCOEE
VIN
WBSJF0C57KB447502
$61,200Zobacz ofertę
2023 BMW M5 SedanDoskonały · 4.6
2023 BMW M5 Sedan
Przebieg
20 254 mi
Location
VA - FREDERICKSBURG
VIN
WBS83CH02PCM84058
$85,000Zobacz ofertę
2025 BMW X3 M50Idealny · 4.9
2025 BMW X3 M50
Przebieg
8518 mi
Location
GA - ROSWELL
VIN
5UX73GP04S9124631
$59,500Zobacz ofertę
2026 BMW X3 M50Idealny · 5.0
2026 BMW X3 M50
Przebieg
17 462 mi
Location
TX - PLANO
VIN
5UX73GP08T9171467
$59,175Zobacz ofertę
2025 BMW X3 M50Idealny · 5.0
2025 BMW X3 M50
Przebieg
7525 mi
Location
NM - Manheim New Mexico
VIN
5UX73GP05S9Y54192
$58,983Zobacz ofertę
2023 BMW M5 SedanIdealny · 5.0
2023 BMW M5 Sedan
Przebieg
10 864 mi
Location
GA - Manheim Georgia
VIN
WBS83CH0XPCL88324
$86,975Zobacz ofertę
2025 BMW X3 M50Idealny · 5.0
2025 BMW X3 M50
Przebieg
18 169 mi
Location
TX - PLANO
VIN
5UX73GP0XS9Z42655
$58,170Zobacz ofertę
2023 BMW 5 Series Sedan M550i xDriveIdealny · 5.0
2023 BMW 5 Series Sedan M550i xDrive
Przebieg
28 659 mi
Location
NJ - IRVINGTON
VIN
WBA13BK04PCM30544
$58,000Zobacz ofertę