2025 BMW M3 Sedan Competition xDrive
Listed as: 2025 BMW M3 Sedan Competition xDrive
WBS33HJ0XSFU83247
•
5,025 mil
•
AWD
•
3.0L 6 Cyl Turbo Gasoline Auto
•
Gasoline/Other
•
Auto
ALL
19
Limited-time offer
Updated: 10.08.2026
Status
Sold
Value
Scope
$86,900 - $93,900
Average
$90,400
Location
FL - Manheim Palm Beach
Pickup
At the Dealer
Highlights
CR REPORT
Sold for:
$93,500
Import Calculator
Estimated costs
Price to Rotterdam
USD
1. Vehicle value
$93,500
2. Auction fee
$1,750
3. Service fee
$500
4. Ground transport
$975
5. Ocean freight from MIAMI
$675
Total to Rotterdam
$97,400
~ 358 812 PLN
5.0
Auto
G
rade
Average
Drives
Starts
Interior odor
Key1
Key fob?
Vehicle History
ANNOUNCEMENTS AND COMMENTS
Announcements
- 3rd Party Seller
- EXECUTIVE PKG, M-CARBON INT. & EXT.
Damage notes
Front Bumper Cover - Chipped
Documents
Title Status
Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
- The vehicle's purchase value under the "Buy Now" system
- AUTOMAX commission
- Ground transport within the U.S. to the port
- Ocean freight (container shipping to Rotterdam)
- Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
- The Rotterdam price
- Customs clearance service costs (agency in the Netherlands)
- Carrier delivery from the European port to your specified home address
- AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
EXECUTIVE PACKAGE - ZPX
Remote Engine Start, Power Tailgate, Full LED Headlights w/Cornering Lights, BMW Curved Display w/HUD, Heated Steering Wheel
M CARBON EXTERIOR PACKAGE - 71CPARKING ASSISTANCE PACKAGE - ZPKParking Assistant Plus
Standard equipment
- Black Grille
- Black Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
- Black Side Windows Trim and Black Front Windshield Trim
- Body-Colored Door Handles
- Body-Colored Front Bumper w/Black Rub Strip/Fascia Accent
- Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
- Fixed Rear Window w/Defroster
- Galvanized Steel/Aluminum/Composite Panels
- Headlights-Automatic Highbeams
- LED Brakelights
- Light Tinted Glass
- Lip Spoiler
- Paint w/Badging
- Perimeter/Approach Lights
- Rocker Panel Extensions
- Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
- Tire Mobility Kit
- Tire Specific Low Tire Pressure Warning
- Tires: 275/35R19 Fr & 285/30R20 Rr High Performance includes Staggered
- Wheels: 19"x9.5" Fr.&20"x10.5"Rr. M Bi-color (1T8) includes Style 826M, Dual-spoke forged
- Window Grid Diversity Antenna
- 12-Way Driver Seat includes Manual Cushion Extension
- 12-Way Passenger Seat includes Manual Cushion Extension
- 3 12V DC Power Outlets
- 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
- Air Filtration
- Cargo Area Concealed Storage
- Cargo Features includes Tire Mobility Kit
- Cargo Net
- Cargo Space Lights
- Compass
- Day-Night Auto-Dimming Rearview Mirror
- Delayed Accessory Power
- Digital/Analog Appearance
- Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
- Driver Foot Rest
- Driver Information Center
- Front And Rear Map Lights
- Front Cupholder
- Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
- Full Cloth Headliner
- Full Floor Console w/Covered Storage and 3 12V DC Power Outlets
- Heated Front Seats
- Illuminated Glove Box
- Instrument Panel Covered Bin, Driver / Passenger And Rear Door Bins
- Interior Lock Disable
- Interior Trim includes Aluminum Instrument Panel Insert, Metal-Look Door Panel Insert, Aluminum Console Insert and Metal-Look Interior Accents
- Leatherette Door Trim Insert
- Lumbar Support
- M Sport Seats
- Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
- Manual Tilt/Telescoping Steering Column
- Memory Settings includes Driver Seat and Door Mirrors
- Metal-Look Gear Shifter Material
- Outside Temp Gauge
- Power Front Seats
- Power Fuel Flap Locking Type
- Rear Cupholder
- Redundant Digital Speedometer
- Sliding Front Center Armrest
- Sport Leather Steering Wheel
- Valet Function
- 15.6 Gal. Fuel Tank
- 3.15 Axle Ratio
- 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
- 70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
- Driver Selectable Ride Control Sport Tuned Adaptive Suspension
- DSC Electronic Stability Control (ESC)
- Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
- Electric Power-Assist Speed-Sensing Steering
- Electro-Mechanical Limited Slip Differential
- Electronic Transfer Case
- Engine Auto Stop-Start Feature
- Engine Oil Cooler
- Front And Rear Anti-Roll Bars
- Gas-Pressurized Shock Absorbers
- M Traction Control ABS And Driveline Traction Control
- Multi-Link Rear Suspension w/Coil Springs
- Regenerative Alternator
- Strut Front Suspension w/Coil Springs
- Transmission w/Driver Selectable Mode, M Steptronic Sequential Shift Control w/Steering Wheel Controls and Oil Cooler
- Airbag Occupancy Sensor
- Blind Spot Detection Blind Spot
- Collision Mitigation-Front
- Curtain 1st And 2nd Row Airbags
- Driver And Passenger Knee Airbag
- Driver Monitoring-Alert
- Dual Stage Driver And Passenger Front Airbags
- Dual Stage Driver And Passenger Seat-Mounted Side Airbags
- Frontal Collision Warning
- Immobilizer
- Lane Departure Warning
- Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
- Park Distance Control Front And Rear Parking Sensors
- Perimeter Alarm
- Rear Child Safety Locks
- Rear Collision Prevention
- Side Impact Beams
- Cruise Control w/Steering Wheel Controls
- Dual Zone Front Automatic Air Conditioning
- FOB Controls includes Keyfob Cargo Access and Keyfob Window Activation
- HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
- Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
- Power Door Locks w/Autolock Feature
- Power Rear Windows
- Power Trunk Rear Cargo Access
- Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
- Rear Climate Controls w/Rear Controls
- Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
- Remote Releases includes Proximity Cargo Access
- Tailgate/Rear Door Lock Included w/Power Door Locks
- Wireless Device Charging
Podobne pojazdy BMW from the US
Idealny · 5.02025 BMW M3 Sedan Competition xDrive
- Przebieg
- 6190 mi
- Location
- NY - VALLEY STREAM
- VIN
- WBS33HJ04SFV39151
$93,500Zobacz ofertę
Idealny · 5.02026 BMW M3 Sedan Competition xDrive
- Przebieg
- 1860 mi
- Location
- CA - Costa Mesa
- VIN
- WBS33HJ00TFW38504
$93,990Zobacz ofertę
Doskonały · 4.62025 BMW M3 Sedan Competition xDrive
- Przebieg
- 13 210 mi
- Location
- CA - SANTA ANA
- VIN
- WBS33HJ07SFU79494
$94,000Zobacz ofertę
Idealny · 5.02024 BMW M3 Sedan Competition xDrive
- Przebieg
- 7111 mi
- Location
- CA - AGOURA HILLS
- VIN
- WBS43AY02RFS18558
$93,000Zobacz ofertę
Idealny · 5.02026 BMW M3 Sedan Competition xDrive
- Przebieg
- 1786 mi
- Location
- FL - MIAMI
- VIN
- WBS33HJ09TFW33768
$94,900Zobacz ofertę
Idealny · 5.02026 BMW M3 Sedan Competition xDrive
- Przebieg
- 6040 mi
- Location
- IL - SCHAUMBURG
- VIN
- WBS33HJ02TFV99950
$95,500Zobacz ofertę
Idealny · 4.82023 BMW M3 Sedan Competition xDrive
- Przebieg
- 23 584 mi
- Location
- NY - WESTBURY
- VIN
- WBS43AY02PFN79267
$95,800Zobacz ofertę
Idealny · 5.02025 BMW M3 Sedan Competition xDrive
- Przebieg
- 3378 mi
- Location
- WI - WAUKESHA
- VIN
- WBS33HJ07SFV13904
$96,900Zobacz ofertę
Idealny · 4.72026 BMW M3 Sedan Competition xDrive
- Przebieg
- 3715 mi
- Location
- TN - Manheim Nashville
- VIN
- WBS33HJ03TFW48251
$90,000Zobacz ofertę
Doskonały · 4.62026 BMW M3 Sedan Competition xDrive
- Przebieg
- 2172 mi
- Location
- UT - SALT LAKE CITY
- VIN
- WBS33HJ02TFW33840
$88,800Zobacz ofertę
Idealny · 5.02026 BMW M3 Sedan Competition
- Przebieg
- 5334 mi
- Location
- PA - WARMINSTER
- VIN
- WBS23HJ04TFW19871
$88,500Zobacz ofertę
Idealny · 4.92025 BMW M3 Sedan Competition xDrive
- Przebieg
- 19 931 mi
- Location
- CT - STAMFORD
- VIN
- WBS33HJ07SFU21398
$87,000Zobacz ofertę
Idealny · 5.02024 BMW M3 Sedan CS
- Przebieg
- 59 577 mi
- Location
- NJ - TRENTON
- VIN
- WBS63AY06RFR46229
$87,000Zobacz ofertę
Idealny · 4.92023 BMW M3 Sedan Competition xDrive
- Przebieg
- 22 245 mi
- Location
- AZ - GILBERT
- VIN
- WBS43AY06PFR13803
$84,991Zobacz ofertę
Wyróżniający się · 3.92025 BMW M3 Sedan
- Przebieg
- 9765 mi
- Location
- MD - Manheim Maryland
- VIN
- WBS13HJ09SFU78497
$81,900Zobacz ofertę
Idealny · 4.92023 BMW M3 Sedan Competition xDrive
- Przebieg
- 35 996 mi
- Location
- CA - AZUSA
- VIN
- WBS43AY03PFR19753
$81,000Zobacz ofertę
Do renowacji · 1.52026 BMW M3 Sedan Competition xDrive
- Przebieg
- 3985 mi
- Location
- CA - Manheim Riverside
- VIN
- WBS33HJ0XTFW05932
$80,000Zobacz ofertę
Idealny · 5.02023 BMW M3 Sedan
- Przebieg
- 27 239 mi
- Location
- NJ - SPRINGFIELD
- VIN
- WBS53AY04PFR12654
$79,995Zobacz ofertę