VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Updated: 27.07.2026
Status Live
Value
Scope $78,000 - $81,100
Average $79,600
Sale ends
Location NY - RONKONKOMA
Pickup At the Dealer
Highlights CR REPORT
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $82,000
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $770
5. Ocean freight from NEW YORK $675
Total to Rotterdam
$85,695 ~ 320 714 PLN
5.0
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score 93
Similar vehicles 89 - 94
Owners 2
Accidents 0
ANNOUNCEMENTS AND COMMENTS

Announcements

  • Blue Light / Title Absent

Damage notes

Emissions/Catalytic/Exhaust - Intake Emission, Exhaust - Modified

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
EXECUTIVE PACKAGE - ZPX

Remote Engine Start, Power Tailgate, BMW Curved Display w/HUD, Heated Steering Wheel

Standard equipment
  • Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
  • Black Grille
  • Black Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
  • Black Side Windows Trim and Black Front Windshield Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
  • Fixed Rear Window w/Defroster
  • Fixed Rear Windows
  • Front License Plate Bracket
  • Galvanized Steel/Aluminum/Composite Panels
  • Headlights-Automatic Highbeams
  • Integrated Roof Antenna
  • LED Brakelights
  • Light Tinted Glass
  • Lip Spoiler
  • Perimeter/Approach Lights
  • Rocker Panel Extensions
  • Side Impact Beams
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers
  • Tire Mobility Kit
  • Tire Specific Low Tire Pressure Warning
  • Tires: 275/35R19 Fr & 285/30R20 Rr Performance includes Non run-flat
  • 12-Way Driver Seat includes Manual Cushion Extension and Power Rear Seat Easy Entry
  • 12-Way Passenger Seat includes Manual Cushion Extension and Power Rear Seat Easy Entry
  • 3 12V DC Power Outlets
  • 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
  • Air Filtration
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Space Lights
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Compass
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Digital Appearance
  • Driver And Passenger Heated Front Seat
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror
  • Driver Foot Rest
  • Driver Information Center
  • Fade-To-Off Interior Lighting
  • Front And Rear Map Lights
  • Front Center Armrest and Rear Center Armrest
  • Front Cupholder
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Cloth Headliner
  • Full Floor Console w/Covered Storage, Mini Overhead Console and 3 12V DC Power Outlets
  • Illuminated Locking Glove Box
  • Instrument Panel Covered Bin, Driver And Passenger Door Bins
  • Interior Trim includes Aluminum Instrument Panel Insert and Metal-Look Interior Accents
  • Leather/Metal-Look Gear Shifter Material
  • Leatherette Door Trim Insert
  • Lumbar Support
  • M Sport Seats includes Heated Front Seats
  • Manual Adjustable Front Head Restraints and Fixed Rear Head Restraints
  • Manual Tilt/Telescoping Steering Column
  • Memory Settings includes Driver Seat and Door Mirrors
  • Outside Temp Gauge
  • Power Front Seats
  • Power Fuel Flap Locking Type
  • Rear Cupholder
  • Redundant Digital Speedometer
  • Sport Leather Steering Wheel
  • Trunk Rear Cargo Access
  • Valet Function
  • 15.6 Gal. Fuel Tank
  • 3.15 Axle Ratio
  • 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
  • 70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
  • ABS And Driveline Traction Control
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • DSC Electronic Stability Control (ESC)
  • Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • Multi-Link Rear Suspension w/Coil Springs
  • Regenerative Alternator
  • Strut Front Suspension w/Coil Springs
  • Transmission w/Driver Selectable Mode and Oil Cooler
  • Airbag Occupancy Sensor
  • Blind Spot Detection Blind Spot
  • Collision Mitigation-Front
  • Curtain 1st And 2nd Row Airbags
  • Driver And Passenger Knee Airbag
  • Driver Monitoring-Alert
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Immobilizer
  • Lane Departure Warning
  • Outboard Front Lap And Shoulder Safety Belts includes Pretensioners
  • Park Distance Control Front And Rear Parking Sensors
  • Perimeter Alarm
  • Rear Collision Prevention
  • Cruise Control w/Steering Wheel Controls
  • Dual Zone Front Automatic Air Conditioning
  • FOB Controls includes Keyfob Cargo Access and Keyfob Window Activation
  • HVAC includes Underseat Ducts and Console Ducts
  • Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
  • Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button
  • Remote Releases includes Comfort Access Proximity Cargo Access

Import pojazdu 2024 BMW M4 Coupe Competition xDrive do Polski

Ten pojazd (2024 BMW M4 Coupe Competition xDrive, VIN WBS43AZ09RCN63814) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 361 600 PLN.

Podobne pojazdy BMW from the US

2025 BMW M4 Competition xDrive CoupeIdealny · 4.8
2025 BMW M4 Competition xDrive Coupe
Przebieg
35 000 mi
Location
CA - Costa Mesa
VIN
WBS33HK07SCS82082
$81,990Zobacz ofertę
2024 BMW M4 Coupe Competition xDriveIdealny · 5.0
2024 BMW M4 Coupe Competition xDrive
Przebieg
41 281 mi
Location
TX - Manheim Dallas-Fort Worth
VIN
WBS43AZ03RCP10466
$81,000Zobacz ofertę
2024 BMW M4 Coupe Competition xDriveDoskonały · 4.6
2024 BMW M4 Coupe Competition xDrive
Przebieg
19 311 mi
Location
NJ - Manheim New Jersey
VIN
WBS43AZ09RCR41792
$80,990Zobacz ofertę
2024 BMW M4 Coupe Competition xDriveIdealny · 5.0
2024 BMW M4 Coupe Competition xDrive
Przebieg
25 354 mi
Location
NV - Manheim Nevada
VIN
WBS43AZ07RCN67859
$80,000Zobacz ofertę
2024 BMW M4 Coupe Competition xDriveIdealny · 5.0
2024 BMW M4 Coupe Competition xDrive
Przebieg
23 445 mi
Location
IL - NORTHBROOK
VIN
WBS43AZ01RCN53584
$79,980Zobacz ofertę
2025 BMW M4 Convertible Competition xDriveIdealny · 5.0
2025 BMW M4 Convertible Competition xDrive
Przebieg
4461 mi
Location
CT - WILLIMANTIC
VIN
WBS43BA09SCT74913
$84,985Zobacz ofertę
2023 BMW M4 Coupe CompetitionZnakomity · 4.3
2023 BMW M4 Coupe Competition
Przebieg
19 795 mi
Location
TX - HOUSTON
VIN
WBS33AZ00PCM11056
$78,991Zobacz ofertę
2025 BMW M4 Competition xDrive CoupeIdealny · 5.0
2025 BMW M4 Competition xDrive Coupe
Przebieg
11 835 mi
Location
CA - Manheim California
VIN
WBS33HK08SCS66103
$85,500Zobacz ofertę
2026 BMW M4 Competition xDrive ConvertibleDoskonały · 4.6
2026 BMW M4 Competition xDrive Convertible
Przebieg
6750 mi
Location
FL - Ocoee
VIN
WBS43BA01TCX69279
$85,500Zobacz ofertę
2024 BMW M4 Convertible Competition xDriveDoskonały · 4.6
2024 BMW M4 Convertible Competition xDrive
Przebieg
8645 mi
Location
NY - PENN YAN
VIN
WBS33BA05RCN53424
$78,500Zobacz ofertę
2024 BMW M4 Coupe Competition xDriveIdealny · 5.0
2024 BMW M4 Coupe Competition xDrive
Przebieg
11 079 mi
Location
CA - SANTA ANA
VIN
WBS43AZ09RCP07569
$85,990Zobacz ofertę
2024 BMW M4 Convertible Competition xDriveIdealny · 5.0
2024 BMW M4 Convertible Competition xDrive
Przebieg
8940 mi
Location
FL - LAKELAND
VIN
WBS33BA08RCN78558
$77,700Zobacz ofertę
2027 BMW M4 Competition xDrive CoupeIdealny · 4.8
2027 BMW M4 Competition xDrive Coupe
Przebieg
6292 mi
Location
TX - Dallas
VIN
WBS33HK02VCY06646
$87,500Zobacz ofertę
2026 BMW M4 Competition xDrive CoupeIdealny · 4.9
2026 BMW M4 Competition xDrive Coupe
Przebieg
1778 mi
Location
GA - Manheim Atlanta
VIN
WBS33HK08TCV49635
$88,400Zobacz ofertę
2022 BMW M4 Convertible Competition xDriveIdealny · 4.9
2022 BMW M4 Convertible Competition xDrive
Przebieg
15 384 mi
Location
FL - VERO BEACH
VIN
WBS33BA05NCK61279
$75,500Zobacz ofertę
2026 BMW M4 Competition xDrive CoupeIdealny · 5.0
2026 BMW M4 Competition xDrive Coupe
Przebieg
2971 mi
Location
GA - Manheim Georgia
VIN
WBS33HK00TCV69507
$89,875Zobacz ofertę
2024 BMW M4 CoupeIdealny · 4.7
2024 BMW M4 Coupe
Przebieg
10 403 mi
Location
PA - Manheim Pennsylvania
VIN
WBS53AZ02RCP71280
$73,900Zobacz ofertę
2024 BMW M4 Coupe CompetitionIdealny · 4.7
2024 BMW M4 Coupe Competition
Przebieg
37 276 mi
Location
FL - RUSKIN
VIN
WBS33AZ07RCN98797
$73,000Zobacz ofertę