2024 BMW M3 Sedan
Listed as: 2024 BMW M3 Sedan
WBS53AY07RFR63150
•
15,033 mil
•
RWD
•
3.0L 6 Cyl Turbo Gasoline Man
•
Gasoline/Other
•
Auto
ALL
25
Limited-time offer
Updated: 22.07.2026
Status
Sold
Value
Scope
$68,500 - $75,400
Average
$71,900
Location
CA - ROSEMEAD
Pickup
At the Dealer
Seller
Nextcar Motor
Highlights
CR REPORT
Sold for:
$77,500
Import Calculator
Estimated costs
Price to Rotterdam
USD
1. Vehicle value
$77,500
2. Auction fee
$1,750
3. Service fee
$500
4. Ground transport
$765
5. Ocean freight from LOS ANGELES
$1275
Total to Rotterdam
$81,790
~ 306 099 PLN
5.0
Auto
G
rade
Average
Drives
Starts
Interior odor
Key1
Key fob?
Vehicle History
ANNOUNCEMENTS AND COMMENTS
Announcements
- No additional announcements
Damage notes
Clean title / No visible damage recorded in the system.
Documents
Title Status
Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
- The vehicle's purchase value under the "Buy Now" system
- AUTOMAX commission
- Ground transport within the U.S. to the port
- Ocean freight (container shipping to Rotterdam)
- Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
- The Rotterdam price
- Customs clearance service costs (agency in the Netherlands)
- Carrier delivery from the European port to your specified home address
- AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
Packages
No data
EquipmentNo detailed data / See the list below
Standard equipment
- Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
- Black Grille
- Black Side Windows Trim and Black Front Windshield Trim
- Body-Colored Door Handles
- Body-Colored Front Bumper
- Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
- Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
- Fixed Rear Window w/Defroster
- Galvanized Steel/Aluminum/Composite Panels
- Headlights-Automatic Highbeams
- LED Brakelights
- Light Tinted Glass
- Lip Spoiler
- Paint w/Badging
- Perimeter/Approach Lights
- Rocker Panel Extensions
- Side Impact Beams
- Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
- Tire Mobility Kit
- Tire Specific Low Tire Pressure Warning
- Window Grid Diversity Antenna
- 12-Way Driver Seat includes Manual Cushion Extension
- 12-Way Passenger Seat includes Manual Cushion Extension
- 3 12V DC Power Outlets
- 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
- Air Filtration
- Cargo Area Concealed Storage
- Cargo Features includes Tire Mobility Kit
- Cargo Net
- Cargo Space Lights
- Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
- Compass
- Day-Night Auto-Dimming Rearview Mirror
- Delayed Accessory Power
- Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
- Driver Foot Rest
- Driver Information Center
- Fade-To-Off Interior Lighting
- Front And Rear Map Lights
- Front Cupholder
- Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
- Full Cloth Headliner
- Full Floor Console w/Covered Storage and 3 12V DC Power Outlets
- Heated Front Seats
- Illuminated Glove Box
- Instrument Panel Covered Bin, Driver / Passenger And Rear Door Bins
- Interior Lock Disable
- Interior Trim includes Aluminum Instrument Panel Insert, Metal-Look Door Panel Insert, Aluminum Console Insert and Metal-Look Interior Accents
- Leather/Metal-Look Gear Shifter Material
- Leatherette Door Trim Insert
- Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
- Manual Tilt/Telescoping Steering Column
- Memory Settings includes Driver Seat and Door Mirrors
- Outside Temp Gauge
- Power Front Seats
- Power Fuel Flap Locking Type
- Rear Cupholder
- Redundant Digital Speedometer
- Sliding Front Center Armrest
- Sport Leather/Metal-Look Steering Wheel
- Trunk Rear Cargo Access
- Valet Function
- 15.6 Gal. Fuel Tank
- 3.46 Axle Ratio
- 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
- 70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
- Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
- DSC Electronic Stability Control (ESC)
- Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
- Electric Power-Assist Speed-Sensing Steering
- Electro-Mechanical Limited Slip Differential
- Engine Auto Stop-Start Feature
- Engine Oil Cooler
- Front And Rear Anti-Roll Bars
- Gas-Pressurized Shock Absorbers
- M Traction Control ABS And Driveline Traction Control
- Multi-Link Rear Suspension w/Coil Springs
- Regenerative Alternator
- Strut Front Suspension w/Coil Springs
- Transmission w/Driver Selectable Mode
- Airbag Occupancy Sensor
- Blind Spot Detection Blind Spot
- Collision Mitigation-Front
- Curtain 1st And 2nd Row Airbags
- Driver And Passenger Knee Airbag
- Driver Monitoring-Alert
- Dual Stage Driver And Passenger Front Airbags
- Dual Stage Driver And Passenger Seat-Mounted Side Airbags
- Frontal Collision Warning
- Immobilizer
- Lane Departure Warning
- Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
- Park Distance Control Front And Rear Parking Sensors
- Perimeter Alarm
- Rear Child Safety Locks
- Rear Collision Prevention
- Cruise Control w/Steering Wheel Controls
- Dual Zone Front Automatic Air Conditioning
- FOB Controls includes Keyfob Cargo Access and Keyfob Window Activation
- HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
- Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
- Power Door Locks w/Autolock Feature
- Power Rear Windows
- Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
- Rear HVAC w/Separate Controls
- Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
- Remote Releases includes Proximity Cargo Access
- Tailgate/Rear Door Lock Included w/Power Door Locks
- Wireless Device Charging
Podobne pojazdy BMW from the US
Idealny · 4.72025 BMW M3 Sedan
- Przebieg
- 7925 mi
- Location
- VA - Manheim Fredericksburg
- VIN
- WBS13HJ01SFU47437
$77,000Zobacz ofertę
Wyróżniający się · 3.92023 BMW M3 Sedan Competition xDrive
- Przebieg
- 12 825 mi
- Location
- GA - ALPHARETTA
- VIN
- WBS43AY03PFP19584
$78,200Zobacz ofertę
Idealny · 4.92022 BMW M3 Sedan
- Przebieg
- 9611 mi
- Location
- NY - WESTBURY
- VIN
- WBS53AY07NFM93034
$78,800Zobacz ofertę
Idealny · 4.82026 BMW M3 Sedan
- Przebieg
- 2167 mi
- Location
- CA - Manheim Riverside
- VIN
- WBS13HJ07TFV69043
$79,800Zobacz ofertę
Idealny · 5.02026 BMW M3 Sedan
- Przebieg
- 6815 mi
- Location
- NY - CARMEL
- VIN
- WBS13HJ09TFV78620
$80,000Zobacz ofertę
Idealny · 5.02022 BMW M3 Sedan
- Przebieg
- 38 903 mi
- Location
- NC - INDIAN TRAIL
- VIN
- WBS53AY09NFL87815
$75,000Zobacz ofertę
Znakomity · 4.32021 BMW M3 Sedan Competition
- Przebieg
- 17 412 mi
- Location
- PA - Manheim Pennsylvania
- VIN
- WBS33AY03MFL25171
$74,500Zobacz ofertę
Doskonały · 4.42023 BMW M3 Sedan Competition
- Przebieg
- 22 897 mi
- Location
- GA - ATHENS
- VIN
- WBS33AY0XPFP56451
$80,900Zobacz ofertę
Idealny · 4.92023 BMW M3 Sedan
- Przebieg
- 12 519 mi
- Location
- CA - Manheim California
- VIN
- WBS53AY01PFN27116
$74,000Zobacz ofertę
Idealny · 4.72023 BMW M3 Sedan Competition
- Przebieg
- 15 882 mi
- Location
- CA - SAN JOSE
- VIN
- WBS33AY05PFR40633
$74,000Zobacz ofertę
Wyróżniający się · 4.02023 BMW M3 Sedan Competition
- Przebieg
- 11 303 mi
- Location
- FL - SAINT PETERSBURG
- VIN
- WBS33AY03PFP76007
$73,500Zobacz ofertę
Idealny · 4.92023 BMW M3 Sedan Competition xDrive
- Przebieg
- 22 245 mi
- Location
- AZ - GILBERT
- VIN
- WBS43AY06PFR13803
$84,991Zobacz ofertę
Idealny · 4.82023 BMW M3 Sedan Competition xDrive
- Przebieg
- 36 055 mi
- Location
- PA - Manheim Pennsylvania
- VIN
- WBS43AY08PFP55433
$84,999Zobacz ofertę
Doskonały · 4.62026 BMW M3 Sedan Competition
- Przebieg
- 6468 mi
- Location
- OH - Manheim Ohio
- VIN
- WBS23HJ0XTFV49373
$85,000Zobacz ofertę
Idealny · 4.92021 BMW M3 Sedan
- Przebieg
- 23 871 mi
- Location
- GA - ROSWELL
- VIN
- WBS53AY0XMFL38315
$69,500Zobacz ofertę
Znakomity · 4.32022 BMW M3 Sedan Competition xDrive
- Przebieg
- 52 625 mi
- Location
- WI - KENOSHA
- VIN
- WBS43AY03NFN06454
$69,069Zobacz ofertę
Idealny · 4.82025 BMW M3 Sedan Competition
- Przebieg
- 19 847 mi
- Location
- GA - ROSWELL
- VIN
- WBS23HJ07SFT76720
$86,500Zobacz ofertę
Wyróżniający się · 3.82024 BMW M3 Sedan Competition xDrive
- Przebieg
- 27 057 mi
- Location
- FL - RIVIERA BEACH
- VIN
- WBS43AY07RFT35312
$68,500Zobacz ofertę