VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Updated: 20.08.2026
Status Live
Value
Scope -
Average -
Sale ends
Location TX - Manheim Texas Hobby
Pickup At the Dealer
Highlights CR REPORT
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $119,991
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $685
5. Ocean freight from HOUSTON $695
Total to Rotterdam
$123,621 ~ 455 407 PLN
0.0
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score 93
Similar vehicles 89 - 94
Owners 3
Accidents 0
ANNOUNCEMENTS AND COMMENTS

Announcements

  • No additional announcements

Damage notes

Clean title / No visible damage recorded in the system.

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
Packages

No data

Equipment

No detailed data / See the list below

Standard equipment
  • Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
  • Black Grille
  • Black Side Windows Trim and Black Front Windshield Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
  • Carbon Fiber Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
  • Fixed Rear Window w/Defroster
  • Fixed Rear Windows
  • Front License Plate Bracket
  • Galvanized Steel/Aluminum/Composite Panels
  • Headlights-Automatic Highbeams
  • Integrated Roof Antenna
  • LED Brakelights
  • Light Tinted Glass
  • Paint w/Stripe
  • Perimeter/Approach Lights
  • Rocker Panel Extensions
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers
  • Tire Mobility Kit
  • Tire Specific Low Tire Pressure Warning
  • Wheels w/Black Accents w/Locks
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 827M) includes M star spoke
  • 2-Way Driver Seat includes Manual Fore/Aft Movement
  • 2-Way Passenger Seat includes Manual Fore/Aft Movement
  • 3 12V DC Power Outlets
  • Air Filtration
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Space Lights
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Compass
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror
  • Driver Foot Rest
  • Driver Information Center
  • Fade-To-Off Interior Lighting
  • Fixed Front Head Restraints
  • Front Cupholder
  • Front Map Lights
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Cloth Headliner
  • Full Floor Console, Mini Overhead Console and 3 12V DC Power Outlets
  • Illuminated Locking Glove Box
  • Instrument Panel Covered Bin, Driver And Passenger Door Bins
  • Interior Trim includes Carbon Fiber/Metal-Look Instrument Panel Insert, Carbon Fiber Console Insert and Metal-Look Interior Accents
  • Leather/Metal-Look Gear Shifter Material
  • M Sport Sport Alcantara Simulated Suede/Carbon Fiber Steering Wheel
  • Manual Tilt/Telescoping Steering Column
  • Memory Settings includes Driver Seat and Door Mirrors
  • Outside Temp Gauge
  • Power Fuel Flap Locking Type
  • Redundant Digital Speedometer
  • Trunk Rear Cargo Access
  • Valet Function
  • 15.6 Gal. Fuel Tank
  • 3.15 Axle Ratio
  • 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control, Ceramic Discs and Electric Parking Brake
  • 70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
  • ABS And Driveline Traction Control
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • DSC Electronic Stability Control (ESC)
  • Dual Titanium Exhaust w/Black Tailpipe Finisher
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • Multi-Link Rear Suspension w/Coil Springs
  • Regenerative Alternator
  • Strut Front Suspension w/Coil Springs
  • Transmission w/Driver Selectable Mode, STEPTRONIC Sequential Shift Control w/Steering Wheel Controls and Oil Cooler
  • Airbag Occupancy Sensor
  • Blind Spot Detection Blind Spot
  • Collision Mitigation-Front
  • Curtain 1st And 2nd Row Airbags
  • Driver And Passenger Knee Airbag
  • Driver Monitoring-Alert
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Immobilizer
  • Lane Departure Warning
  • Outboard Front Lap And Shoulder Safety Belts includes Pretensioners
  • Park Distance Control Front And Rear Parking Sensors
  • Perimeter Alarm
  • Rear Collision Prevention
  • Side Impact Beams
  • Cruise Control w/Steering Wheel Controls
  • Dual Zone Front Automatic Air Conditioning
  • FOB Controls includes Keyfob Cargo Access and Keyfob Window Activation
  • HVAC includes Underseat Ducts and Console Ducts
  • Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
  • Rear HVAC w/Separate Controls
  • Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button
  • Remote Releases includes Comfort Access Proximity Cargo Access
  • BLACK W/RED/GREY CONTRAST, FULL MERINO LEATHER UPHOLSTERY
  • M CARBON BUCKET SEATS
  • WHEELS: 19" X 9.5" FR/20" X 10.5" RR M STAR SPOKE
  • WIFI HOTSPOT

Import pojazdu 2023 BMW M4 Coupe CSL do Polski

Ten pojazd (2023 BMW M4 Coupe CSL, VIN WBS63AZ01PCL28975) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 509 900 PLN.

Podobne pojazdy BMW from the US

2025 BMW M4 CS CoupeIdealny · 5.0
2025 BMW M4 CS Coupe
Przebieg
5338 mi
Location
CA - MURRIETA
VIN
WBS43HK01SCU37858
$117,700Zobacz ofertę
2026 BMW M4 Competition xDrive CoupeIdealny · 5.0
2026 BMW M4 Competition xDrive Coupe
Przebieg
754 mi
Location
GA - ALPHARETTA
VIN
WBS33HK08TCX10615
$92,000Zobacz ofertę
2027 BMW M4 Competition xDrive CoupeDoskonały · 4.5
2027 BMW M4 Competition xDrive Coupe
Przebieg
6950 mi
Location
MA - North Dighton
VIN
WBS33HK08VCY09339
$89,500Zobacz ofertę
2026 BMW M4 Competition xDrive CoupeIdealny · 5.0
2026 BMW M4 Competition xDrive Coupe
Przebieg
1321 mi
Location
GA - Manheim Atlanta
VIN
WBS33HK0XTCV47885
$89,400Zobacz ofertę
2026 BMW M4 Competition xDrive CoupeIdealny · 4.9
2026 BMW M4 Competition xDrive Coupe
Przebieg
1448 mi
Location
GA - Manheim Atlanta
VIN
WBS33HK02TCV47881
$89,400Zobacz ofertę
2027 BMW M4 Competition xDrive CoupeDoskonały · 4.5
2027 BMW M4 Competition xDrive Coupe
Przebieg
8231 mi
Location
FL - West Palm Beach
VIN
WBS33HK08VCY01743
$88,500Zobacz ofertę
2025 BMW M4 Competition xDrive CoupeIdealny · 5.0
2025 BMW M4 Competition xDrive Coupe
Przebieg
2268 mi
Location
GA - ALPHARETTA
VIN
WBS33HK09SCU25338
$88,500Zobacz ofertę
2027 BMW M4 Competition xDrive CoupeIdealny · 5.0
2027 BMW M4 Competition xDrive Coupe
Przebieg
6052 mi
Location
MA - North Dighton
VIN
WBS33HK03VCX98735
$88,500Zobacz ofertę
2026 BMW M4 Competition xDrive ConvertibleDoskonały · 4.6
2026 BMW M4 Competition xDrive Convertible
Przebieg
6693 mi
Location
FL - Ocoee
VIN
WBS43BA0XTCX71824
$88,000Zobacz ofertę
2026 BMW M4 Competition xDrive CoupeIdealny · 4.9
2026 BMW M4 Competition xDrive Coupe
Przebieg
1778 mi
Location
GA - Manheim Atlanta
VIN
WBS33HK08TCV49635
$88,000Zobacz ofertę
2026 BMW M4 Competition xDrive ConvertibleIdealny · 5.0
2026 BMW M4 Competition xDrive Convertible
Przebieg
3602 mi
Location
TX - EL PASO
VIN
WBS43BA02TCV03883
$87,000Zobacz ofertę
2024 BMW M4 Coupe Competition xDriveIdealny · 5.0
2024 BMW M4 Coupe Competition xDrive
Przebieg
11 079 mi
Location
CA - SANTA ANA
VIN
WBS43AZ09RCP07569
$85,990Zobacz ofertę
2025 BMW M4 Competition xDrive CoupeIdealny · 5.0
2025 BMW M4 Competition xDrive Coupe
Przebieg
20 643 mi
Location
PA - Manheim Pennsylvania
VIN
WBS33HK07SCT98821
$85,900Zobacz ofertę
2025 BMW M4 Convertible Competition xDriveIdealny · 5.0
2025 BMW M4 Convertible Competition xDrive
Przebieg
4461 mi
Location
CT - WILLIMANTIC
VIN
WBS43BA09SCT74913
$84,985Zobacz ofertę
2026 BMW M4 Competition xDrive ConvertibleDoskonały · 4.6
2026 BMW M4 Competition xDrive Convertible
Przebieg
6750 mi
Location
FL - Ocoee
VIN
WBS43BA01TCX69279
$84,500Zobacz ofertę
2025 BMW M4 Competition xDrive CoupeZnakomity · 4.3
2025 BMW M4 Competition xDrive Coupe
Przebieg
19 249 mi
Location
PA - Manheim Pennsylvania
VIN
WBS33HK01SCT52546
$82,000Zobacz ofertę
2025 BMW M4 Competition xDrive CoupeDoskonały · 4.6
2025 BMW M4 Competition xDrive Coupe
Przebieg
23 378 mi
Location
PA - Manheim Pennsylvania
VIN
WBS33HK03SCS24728
$81,002Zobacz ofertę
2025 BMW M4 Convertible Competition xDriveIdealny · 4.8
2025 BMW M4 Convertible Competition xDrive
Przebieg
7777 mi
Location
GA - UNION CITY
VIN
WBS43BA00SCT61824
$81,000Zobacz ofertę