VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Updated: 20.08.2026
Status Live
Value
Scope $70,000 - $75,300
Average $72,600
Sale ends
Location NJ - WAYNE
Pickup At the Dealer
Highlights CR REPORT
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $78,900
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $650
5. Wysyłka morska z BRAK/DOMYŚLNY $675
Total to Rotterdam
$82,475 ~ 303 830 PLN
* The exact location of the Manheim lot is not in the database. Logistics rates have been applied as defaults. Before purchasing, ask the administrator for an exact verification.
4.7
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score 94
Similar vehicles 90 - 95
Owners 3
Accidents 0
ANNOUNCEMENTS AND COMMENTS

Announcements

  • No additional announcements

Damage notes

Clean title / No visible damage recorded in the system.

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
Packages

No data

Equipment

No detailed data / See the list below

Standard equipment
  • Black Grille
  • Black Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
  • Black Side Windows Trim and Black Front Windshield Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
  • Fixed Rear Window w/Defroster
  • Galvanized Steel/Aluminum/Composite Panels
  • Headlights-Automatic Highbeams
  • LED Brakelights
  • Light Tinted Glass
  • Lip Spoiler
  • Paint w/Badging
  • Perimeter/Approach Lights
  • Rocker Panel Extensions
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
  • Tire Mobility Kit
  • Tire Specific Low Tire Pressure Warning
  • Tires: 275/35R19 Fr & 285/30R20 Rr Performance includes Non run-flat
  • Wheels: 19"x9.5" Fr.&20"x10.5"Rr. M Bi-color (1T8) includes Style 826M, Double-spoke
  • Window Grid Diversity Antenna
  • 12-Way Driver Seat includes Manual Cushion Extension
  • 12-Way Passenger Seat includes Manual Cushion Extension
  • 3 12V DC Power Outlets
  • 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
  • Air Filtration
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Net
  • Cargo Space Lights
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Compass
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
  • Driver Foot Rest
  • Driver Information Center
  • Fade-To-Off Interior Lighting
  • Front And Rear Map Lights
  • Front Cupholder
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Cloth Headliner
  • Full Floor Console w/Covered Storage and 3 12V DC Power Outlets
  • Heated Front Seats
  • Illuminated Glove Box
  • Instrument Panel Covered Bin, Driver / Passenger And Rear Door Bins
  • Interior Lock Disable
  • Interior Trim includes Aluminum Instrument Panel Insert, Metal-Look Door Panel Insert, Aluminum Console Insert and Metal-Look Interior Accents
  • Leather/Metal-Look Gear Shifter Material
  • Leatherette Door Trim Insert
  • Lumbar Support
  • M Sport Seats
  • Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Manual Tilt/Telescoping Steering Column
  • Memory Settings includes Driver Seat and Door Mirrors
  • Outside Temp Gauge
  • Power Front Seats
  • Power Fuel Flap Locking Type
  • Rear Cupholder
  • Redundant Digital Speedometer
  • Sliding Front Center Armrest
  • Sport Leather/Metal-Look Steering Wheel
  • Trunk Rear Cargo Access
  • Valet Function
  • 15.6 Gal. Fuel Tank
  • 3.15 Axle Ratio
  • 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
  • 70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • DSC Electronic Stability Control (ESC)
  • Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Electronic Transfer Case
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • M Traction Control ABS And Driveline Traction Control
  • Multi-Link Rear Suspension w/Coil Springs
  • Regenerative Alternator
  • Strut Front Suspension w/Coil Springs
  • Transmission w/Driver Selectable Mode, M Steptronic Sequential Shift Control w/Steering Wheel Controls and Oil Cooler
  • Airbag Occupancy Sensor
  • Blind Spot Detection Blind Spot
  • Collision Mitigation-Front
  • Curtain 1st And 2nd Row Airbags
  • Driver And Passenger Knee Airbag
  • Driver Monitoring-Alert
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Frontal Collision Warning
  • Immobilizer
  • Lane Departure Warning
  • Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
  • Park Distance Control Front And Rear Parking Sensors
  • Perimeter Alarm
  • Rear Child Safety Locks
  • Rear Collision Prevention
  • Side Impact Beams
  • Cruise Control w/Steering Wheel Controls
  • Dual Zone Front Automatic Air Conditioning
  • FOB Controls includes Keyfob Cargo Access and Keyfob Window Activation
  • HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
  • Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Power Rear Windows
  • Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
  • Rear HVAC w/Separate Controls
  • Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
  • Remote Releases includes Proximity Cargo Access
  • Tailgate/Rear Door Lock Included w/Power Door Locks

Import pojazdu 2023 BMW M3 Sedan Competition xDrive do Polski

Ten pojazd (2023 BMW M3 Sedan Competition xDrive, VIN WBS43AY09PFP60026) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 342 900 PLN.

Podobne pojazdy BMW from the US

2022 BMW M3 SedanIdealny · 4.9
2022 BMW M3 Sedan
Przebieg
9611 mi
Location
NY - WESTBURY
VIN
WBS53AY07NFM93034
$78,800Zobacz ofertę
2025 BMW M3 SedanIdealny · 4.8
2025 BMW M3 Sedan
Przebieg
9154 mi
Location
GA - Manheim Georgia
VIN
WBS13HJ03SFU03729
$79,200Zobacz ofertę
2023 BMW M3 Sedan CompetitionDoskonały · 4.4
2023 BMW M3 Sedan Competition
Przebieg
22 897 mi
Location
GA - ATHENS
VIN
WBS33AY0XPFP56451
$79,800Zobacz ofertę
2023 BMW M3 SedanIdealny · 5.0
2023 BMW M3 Sedan
Przebieg
27 239 mi
Location
NJ - SPRINGFIELD
VIN
WBS53AY04PFR12654
$79,995Zobacz ofertę
2026 BMW M3 Sedan Competition xDriveDo renowacji · 1.5
2026 BMW M3 Sedan Competition xDrive
Przebieg
3985 mi
Location
CA - Manheim Riverside
VIN
WBS33HJ0XTFW05932
$80,000Zobacz ofertę
2023 BMW M3 Sedan Competition xDriveIdealny · 4.9
2023 BMW M3 Sedan Competition xDrive
Przebieg
35 996 mi
Location
CA - AZUSA
VIN
WBS43AY03PFR19753
$81,000Zobacz ofertę
2025 BMW M3 SedanWyróżniający się · 3.9
2025 BMW M3 Sedan
Przebieg
9765 mi
Location
MD - Manheim Maryland
VIN
WBS13HJ09SFU78497
$81,900Zobacz ofertę
2022 BMW M3 SedanIdealny · 5.0
2022 BMW M3 Sedan
Przebieg
38 903 mi
Location
NC - INDIAN TRAIL
VIN
WBS53AY09NFL87815
$75,000Zobacz ofertę
2024 BMW M3 SedanIdealny · 5.0
2024 BMW M3 Sedan
Przebieg
29 747 mi
Location
VA - STERLING
VIN
WBS53AY0XRFR51798
$75,000Zobacz ofertę
2024 BMW M3 SedanIdealny · 5.0
2024 BMW M3 Sedan
Przebieg
25 106 mi
Location
FL - SARASOTA
VIN
WBS53AY03RFR62111
$75,000Zobacz ofertę
2024 BMW M3 Sedan CompetitionDoskonały · 4.6
2024 BMW M3 Sedan Competition
Przebieg
31 648 mi
Location
CA - AZUSA
VIN
WBS33AY08RFS08404
$74,000Zobacz ofertę
2023 BMW M3 Sedan Competition xDriveIdealny · 4.9
2023 BMW M3 Sedan Competition xDrive
Przebieg
22 245 mi
Location
AZ - GILBERT
VIN
WBS43AY06PFR13803
$84,991Zobacz ofertę
2023 BMW M3 SedanIdealny · 4.7
2023 BMW M3 Sedan
Przebieg
29 801 mi
Location
AZ - MESA
VIN
WBS53AY08PFP92230
$71,999Zobacz ofertę
2021 BMW M3 Sedan CompetitionIdealny · 4.8
2021 BMW M3 Sedan Competition
Przebieg
38 341 mi
Location
CA - Costa Mesa
VIN
WBS33AY06MFL43311
$71,990Zobacz ofertę
2021 BMW M3 Sedan CompetitionIdealny · 5.0
2021 BMW M3 Sedan Competition
Przebieg
37 535 mi
Location
NY - SYRACUSE
VIN
WBS33AY09MFL17592
$70,999Zobacz ofertę
2025 BMW M3 Sedan Competition xDriveIdealny · 4.9
2025 BMW M3 Sedan Competition xDrive
Przebieg
19 931 mi
Location
CT - STAMFORD
VIN
WBS33HJ07SFU21398
$87,000Zobacz ofertę
2024 BMW M3 Sedan CSIdealny · 5.0
2024 BMW M3 Sedan CS
Przebieg
59 577 mi
Location
NJ - TRENTON
VIN
WBS63AY06RFR46229
$87,000Zobacz ofertę
2026 BMW M3 Sedan CompetitionIdealny · 5.0
2026 BMW M3 Sedan Competition
Przebieg
5334 mi
Location
PA - WARMINSTER
VIN
WBS23HJ04TFW19871
$88,500Zobacz ofertę