VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Updated: 20.08.2026
Status Live
Value
Scope $44,800 - $50,900
Average $47,900
Sale ends
Location IL - CHICAGO
Pickup At the Dealer
Highlights CR REPORT
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $56,995
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $795
5. Ocean freight from CHICAGO $695
Total to Rotterdam
$60,735 ~ 223 742 PLN
0.0
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score 72
Similar vehicles 92 - 97
Owners 3
Accidents 1
ANNOUNCEMENTS AND COMMENTS

Announcements

  • Frame or Structural Damage

Damage notes

Clean title / No visible damage recorded in the system.

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
COMPETITION PACKAGE - ZCP

Extended Shadowline Trim, M Sport Exhaust System, Competition Package (7MA), black chrome tailpipes, lowered sport suspension and extended black high-gloss design elements, Individual Shadowline Lights, Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr M Y-Spoke, Style 789M, Forged bi-color, Tires: 275/35R20 Fr & 285/35R20 Rr Performance, Non run-flat, M Seat Belts

DRIVING ASSISTANCE PLUS PACKAGE - ZDB

Active Driving Assistant Pro, Active Cruise Control w/Stop and Go, Active Lane Keeping Assistant w/side collision avoidance, Traffic Jam Assistant, Evasion Aid and Cross-Traffic Alert Front, Extended Traffic Jam Assistant, For limited access highways

EXECUTIVE PACKAGE - ZEC

Front Ventilated Seats, Active Park Distance Control, Soft-Close Automatic Doors, Drive Recorder, Surround View w/3D View, Rear View Camera, Front Massaging Seats, Power Rear Sunshade & Rear Side Window Shades, Front & Rear Heated Seats, Parking Assistant Plus

Standard equipment
  • Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
  • Black Grille w/Chrome Surround
  • Black Side Windows Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper
  • Body-Colored Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
  • Fixed Rear Window w/Defroster
  • Galvanized Steel/Aluminum/Composite Panels
  • Headlights-Automatic Highbeams
  • LED Brakelights
  • Light Tinted Glass
  • Lip Spoiler
  • Perimeter/Approach Lights
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
  • Tire Mobility Kit
  • Tire Specific Low Tire Pressure Warning
  • Window Grid Diversity Antenna
  • 12-Way Driver Seat
  • 12-Way Passenger Seat
  • 2 Seatback Storage Pockets
  • 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
  • 5 12V DC Power Outlets
  • Air Filtration
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Space Lights
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
  • Driver Foot Rest
  • Driver Information Center
  • Fade-To-Off Interior Lighting
  • Fixed Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Front And Rear Map Lights
  • Front Center Armrest and Rear Center Armrest w/Storage
  • Front Cupholder
  • Full Alcantara Simulated Suede Headliner
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Floor Console w/Covered Storage and 5 12V DC Power Outlets
  • Head-Up Display
  • Heated Front Seats
  • Illuminated Locking Glove Box
  • Instrument Panel Covered Bin, Driver / Passenger And Rear Door Bins
  • Interior Lock Disable
  • Interior Trim includes Metal-Look Interior Accents and Leatherette Upholstered Dashboard
  • Leather/Metal-Look Gear Shifter Material
  • Leatherette Door Trim Insert
  • Memory Settings includes Driver And Passenger Seats, Door Mirrors and Steering Wheel
  • Multi-Function Seats w/Lumbar Support
  • Outside Temp Gauge
  • Power Front Seats
  • Power Fuel Flap Locking Type
  • Power Tilt/Telescoping Steering Column
  • Rear Cupholder
  • Redundant Digital Speedometer
  • Sport Bucket Front Seats
  • Sport Heated Leather Steering Wheel w/Auto Tilt-Away
  • Trunk/Hatch Auto-Latch
  • Valet Function
  • 20.1 Gal. Fuel Tank
  • 3.15 Axle Ratio
  • 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
  • ABS And Driveline Traction Control
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • Battery w/Run Down Protection
  • Double Wishbone Front Suspension w/Coil Springs
  • Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Electronic Stability Control (ESC)
  • Electronic Transfer Case
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • Multi-Link Rear Suspension w/Coil Springs
  • Regenerative 249 Amp Alternator
  • Transmission w/Driver Selectable Mode and STEPTRONIC Sequential Shift Control w/Steering Wheel Controls
  • Active Blind Spot Detection Blind Spot
  • Airbag Occupancy Sensor
  • Collision Mitigation-Front
  • Curtain 1st And 2nd Row Airbags
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Frontal Collision Warning w/City Collision Mitigation
  • Immobilizer
  • Lane Departure Warning with steering correction Lane Departure Warning
  • Lane Departure Warning with steering correction Lane Keeping Assist
  • Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
  • Park Distance Control Front And Rear Parking Sensors
  • Perimeter Alarm
  • Rear Child Safety Locks
  • Rear Collision Preparation and Cross Traffic Alert
  • Side Impact Beams
  • Cruise Control w/Steering Wheel Controls
  • FOB Controls includes Keyfob Cargo Access, Keyfob Window Activation and Keyfob Remote Start
  • HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
  • Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Power Rear Windows
  • Power Trunk Rear Cargo Access
  • Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
  • Rear HVAC w/Separate Controls
  • Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
  • Remote Releases includes Comfort Access Proximity Cargo Access
  • Voice Activated Dual Zone Front And Rear Automatic Air Conditioning
  • Wireless Charging

Import pojazdu 2021 BMW M5 Sedan do Polski

Ten pojazd (2021 BMW M5 Sedan, VIN WBS83CH07MCF34628) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 254 700 PLN.

Podobne pojazdy BMW from the US

2025 BMW X3 M50Doskonały · 4.4
2025 BMW X3 M50
Przebieg
12 941 mi
Location
FL - FORT WALTON BEACH
VIN
5UX73GP0XS9121619
$56,999Zobacz ofertę
2026 BMW X3 M50Idealny · 4.9
2026 BMW X3 M50
Przebieg
6446 mi
Location
FL - West Palm Beach
VIN
5UX73GP07T9403881
$56,900Zobacz ofertę
2026 BMW X3 M50Idealny · 5.0
2026 BMW X3 M50
Przebieg
6643 mi
Location
TN - Mt. Juliet
VIN
5UX73GP01T9404220
$56,900Zobacz ofertę
2026 BMW X3 M50Znakomity · 4.2
2026 BMW X3 M50
Przebieg
11 524 mi
Location
PA - Manheim Pennsylvania
VIN
5UX73GP03T9394340
$56,700Zobacz ofertę
2026 BMW X3 M50Idealny · 4.9
2026 BMW X3 M50
Przebieg
6354 mi
Location
TN - Mt. Juliet
VIN
5UX73GP07T9444964
$56,600Zobacz ofertę
2023 BMW 5 Series Sedan M550i xDriveDoskonały · 4.6
2023 BMW 5 Series Sedan M550i xDrive
Przebieg
25 211 mi
Location
PA - CHADDS FORD
VIN
WBA13BK06PCM94763
$57,500Zobacz ofertę
2019 BMW M5 SedanIdealny · 5.0
2019 BMW M5 Sedan
Przebieg
52 618 mi
Location
IL - NORTHBROOK
VIN
WBSJF0C55KB448518
$57,980Zobacz ofertę
2026 BMW X3 M50Idealny · 4.9
2026 BMW X3 M50
Przebieg
7594 mi
Location
WA - Kent
VIN
5UX73GP09T9424182
$56,000Zobacz ofertę
2023 BMW 5 Series Sedan M550i xDriveIdealny · 5.0
2023 BMW 5 Series Sedan M550i xDrive
Przebieg
28 659 mi
Location
NJ - IRVINGTON
VIN
WBA13BK04PCM30544
$58,000Zobacz ofertę
2026 BMW X3 M50Idealny · 4.8
2026 BMW X3 M50
Przebieg
8376 mi
Location
MN - Maple Grove
VIN
5UX73GP02T9425061
$55,800Zobacz ofertę
2023 BMW X6 Sports Activity Coupe M50iDoskonały · 4.4
2023 BMW X6 Sports Activity Coupe M50i
Przebieg
12 932 mi
Location
FL - Manheim Orlando
VIN
5UXCY8C00P9N78362
$55,500Zobacz ofertę
2026 BMW X3 M50Idealny · 5.0
2026 BMW X3 M50
Przebieg
6676 mi
Location
OR - Portland
VIN
5UX73GP00T9444711
$55,400Zobacz ofertę
2025 BMW X3 M50Doskonały · 4.4
2025 BMW X3 M50
Przebieg
19 432 mi
Location
NC - SANFORD
VIN
5UX73GP08S9X55480
$55,300Zobacz ofertę
2025 BMW X3 M50 xDriveIdealny · 5.0
2025 BMW X3 M50 xDrive
Przebieg
7223 mi
Location
MI - BURTON
VIN
5UX73GP04S9Y14332
$58,700Zobacz ofertę
2026 BMW X3 M50Doskonały · 4.6
2026 BMW X3 M50
Przebieg
7507 mi
Location
CA - Hayward
VIN
5UX73GP09T9401095
$55,200Zobacz ofertę
2026 BMW X3 M50Doskonały · 4.6
2026 BMW X3 M50
Przebieg
4500 mi
Location
FL - Manheim Fort Lauderdale
VIN
5UX73GP09T9388624
$55,200Zobacz ofertę
2026 BMW X3 M50Idealny · 4.8
2026 BMW X3 M50
Przebieg
6955 mi
Location
TN - Mt. Juliet
VIN
5UX73GP06T9396793
$55,200Zobacz ofertę
2019 BMW M5 Sedan CompetitionIdealny · 4.7
2019 BMW M5 Sedan Competition
Przebieg
53 373 mi
Location
FL - Manheim Lakeland
VIN
WBSJF0C50KB446725
$55,000Zobacz ofertę