VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Updated: 30.07.2026
Status Live
Value
Scope $49,000 - $52,300
Average $50,700
Sale ends
Location NJ - Manheim New Jersey
Pickup At the Dealer
Highlights CR REPORT
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $53,990
2. Auction fee $1,750
3. Service fee $500
4. Ground transport $710
5. Ocean freight from NEW YORK $675
Total to Rotterdam
$57,625 ~ 215 662 PLN
4.5
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score 97
Similar vehicles 90 - 95
Owners 2
Accidents 0
ANNOUNCEMENTS AND COMMENTS

Announcements

  • No additional announcements

Damage notes

Clean title / No visible damage recorded in the system.

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
EXECUTIVE PACKAGE - ZEC

Adaptive Full LED Lights, WiFi Hotspot, complimentary 3-month or 3GB trial, Heated Steering Wheel, Automatic High Beams, Speed Limit Info, Wireless Charging

Standard equipment
  • Black Grille
  • Black Side Windows Trim and Black Front Windshield Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper
  • Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
  • Body-Colored Rear Bumper
  • Fixed Rear Window w/Defroster
  • Fixed Rear Windows
  • Fully Galvanized Steel Panels
  • LED Brakelights
  • Light Tinted Glass
  • Lip Spoiler
  • Perimeter/Approach Lights
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
  • Tire Mobility Kit
  • Tire Specific Low Tire Pressure Warning
  • Tires: 245/35R19 Fr & 265/35R19 Rr Mixed Perf
  • Window Grid Diversity Antenna
  • 2 Seatback Storage Pockets
  • 2-Way Driver Seat includes Manual Cushion Extension
  • 2-Way Passenger Seat includes Manual Cushion Extension
  • 3 12V DC Power Outlets
  • 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
  • Air Filtration
  • Alcantara Simulated Suede Door Trim Insert
  • Analog Appearance
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Net
  • Cargo Space Lights
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Driver And Passenger Door Bins
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
  • Driver Foot Rest
  • Driver Information Center
  • Fade-To-Off Interior Lighting
  • Fixed Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Front Cupholder
  • Front Map Lights
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Cloth Headliner
  • Full Floor Console w/Covered Storage, Seat Integrated Console w/Storage and 3 12V DC Power Outlets
  • Heated Front Seats
  • Illuminated Locking Glove Box
  • Interior Lock Disable
  • Interior Trim includes Carbon Fiber Instrument Panel Insert, Carbon Fiber Door Panel Insert, Carbon Fiber Console Insert and Piano Black/Aluminum Interior Accents
  • Leather/Metal-Look Gear Shifter Material
  • Lumbar Support
  • M Sport Seats
  • Manual Tilt/Telescoping Steering Column
  • Memory Settings includes Driver Seat and Door Mirrors
  • Outside Temp Gauge
  • Power Front Seats
  • Power Fuel Flap Locking Type
  • Rear Cupholder
  • Sliding Front Center Armrest and Rear Center Armrest
  • Sport Leather/Metal-Look Steering Wheel
  • Trunk Rear Cargo Access
  • Valet Function
  • 13.7 Gal. Fuel Tank
  • 3.46 Axle Ratio
  • 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control
  • 90-Amp/Hr Maintenance-Free Battery w/Run Down Protection
  • ABS And Driveline Traction Control
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Electronic Stability Control (ESC)
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • Multi-Link Rear Suspension w/Coil Springs
  • Quasi-Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
  • Regenerative 210 Amp Alternator
  • Sport Tuned Suspension
  • Strut Front Suspension w/Coil Springs
  • Active Driving Assistant
  • Airbag Occupancy Sensor
  • Collision Mitigation-Front
  • Curtain 1st And 2nd Row Airbags
  • Driver And Passenger Knee Airbag
  • Driver Monitoring-Alert
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Immobilizer
  • Lane Departure Warning
  • Outboard Front Lap And Shoulder Safety Belts includes Pretensioners
  • Park Distance Control Front And Rear Parking Sensors
  • Perimeter Alarm
  • Side Impact Beams
  • Automatic Equalizer
  • Cruise Control w/Steering Wheel Controls
  • Dual Zone Front Automatic Air Conditioning
  • FOB Controls includes Keyfob Cargo Access and Keyfob Window Activation
  • HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
  • Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Proximity Key For Doors And Push Button Start
  • Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry and Panic Button
  • Remote Releases includes Comfort Access Proximity Cargo Access
  • Remote Services
  • Tailgate/Rear Door Lock Included w/Power Door Locks

Import pojazdu 2020 BMW M2 Coupe Competition do Polski

Ten pojazd (2020 BMW M2 Coupe Competition, VIN WBS2U7C02L7E79417) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 245 900 PLN.

Podobne pojazdy BMW from the US

2026 BMW 2 Series Coupe M240i xDriveIdealny · 5.0
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
6704 mi
Location
MA - North Dighton
VIN
3MW53CM02T8G40341
$53,500Zobacz ofertę
2020 BMW M2 Coupe CompetitionDoskonały · 4.6
2020 BMW M2 Coupe Competition
Przebieg
25 971 mi
Location
NJ - kearny
VIN
WBS2U7C01L7E64066
$52,900Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDrivePrzyzwoity · 2.6
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
9501 mi
Location
UT - West Bountiful
VIN
3MW53CM03T8G02794
$52,500Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveDoskonały · 4.6
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
2780 mi
Location
NV - Manheim Nevada
VIN
3MW53CM08T8G38934
$51,500Zobacz ofertę
2021 BMW M2 Coupe CompetitionIdealny · 4.9
2021 BMW M2 Coupe Competition
Przebieg
32 416 mi
Location
FL - PORT CHARLOTTE
VIN
WBS2U7C02M7H27814
$51,500Zobacz ofertę
2023 BMW 2 Series Coupe M240i xDriveZnakomity · 4.2
2023 BMW 2 Series Coupe M240i xDrive
Przebieg
29 959 mi
Location
NM - ALBUQUERQUE
VIN
3MW53CM00P8C92092
$51,200Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveIdealny · 4.9
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
5862 mi
Location
TX - Manheim Dallas
VIN
3MW53CM03T8G26576
$51,000Zobacz ofertę
2025 BMW 2 Series Coupe M240i xDriveIdealny · 5.0
2025 BMW 2 Series Coupe M240i xDrive
Przebieg
1862 mi
Location
NJ - NORTH PLAINFIELD
VIN
3MW53CM07S8F16810
$56,995Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveIdealny · 4.7
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
8259 mi
Location
GA - Manheim Atlanta
VIN
3MW53CM03T8G24519
$50,700Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveIdealny · 5.0
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
5148 mi
Location
CO - Manheim Denver
VIN
3MW53CM01T8G27631
$50,500Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveZnakomity · 4.3
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
7236 mi
Location
MI - Manheim Detroit
VIN
3MW53CM09T8G26131
$50,500Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveIdealny · 4.9
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
9166 mi
Location
TX - Manheim Dallas
VIN
3MW53CM04T8G27137
$50,500Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveIdealny · 4.9
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
8222 mi
Location
GA - Manheim Atlanta
VIN
3MW53CM01T8G23790
$50,400Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveIdealny · 4.8
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
7996 mi
Location
GA - Manheim Atlanta
VIN
3MW53CM0XT8G22458
$50,300Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveDoskonały · 4.6
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
7648 mi
Location
GA - Manheim Atlanta
VIN
3MW53CM06T8G24658
$50,100Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveDoskonały · 4.6
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
6459 mi
Location
MO - Manheim Kansas City
VIN
3MW53CM08T8G23365
$50,000Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveDoskonały · 4.5
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
7228 mi
Location
MO - Manheim Kansas City
VIN
3MW53CM05T8G24635
$50,000Zobacz ofertę
2026 BMW 2 Series Coupe M240i xDriveDoskonały · 4.6
2026 BMW 2 Series Coupe M240i xDrive
Przebieg
8529 mi
Location
MO - Manheim Kansas City
VIN
3MW53CM04T8G30880
$50,000Zobacz ofertę