VIN Search

Enter a 17-character VIN to search our current and historical database of vehicles from Manheim auctions.

Limited-time offer
Aktualizacja: 17.08.2026
Status On Sale
Value
Scope $35,300 - $42,000
Average $38,700
Sale ends
Location NV - Manheim Nevada
Pickup At the Dealer
Seller Eurotake Llc
Highlights CR REPORT
Import Calculator
Estimated costs
Price to Rotterdam USD
1. Vehicle value $32,250
2. Auction fee $1,200
3. Service fee $500
4. Ground transport $925
5. Ocean freight from LOS ANGELES $1275
Total to Rotterdam
$36,150 ~ 134 865 PLN
0.0
Average
Drives
Starts
Interior odor
Key1
Key fob?

Vehicle History

Score --
Similar vehicles - -
Owners
Accidents
ANNOUNCEMENTS AND COMMENTS

Announcements

  • Red Light / AS-IS
  • Frame or Structural Damage

Damage notes

Clean title / No visible damage recorded in the system.

Documents

Title Status Current
Purchase procedure
1
You decide and verify
You choose a vehicle on the platform and assess its condition yourself based on the photos provided, and you verify the reports (Carfax/AutoCheck). If you have any questions, contact us before placing a purchase order.
2
Purchase order
Once you are sure of your choice, you let us know you want to buy ("Buy Now" listings only). We carry out the order on your behalf with our partner AUTOMAX, and you pay for the transaction directly from your own bank.
3
Ground transport in the U.S. and ocean shipping
Once the vehicle is paid for, we take over the logistics. We collect the car from the AUTOMAX lot to our U.S. yard near the port, secure it in a container, and ship it by sea to Europe.
4
Customs Clearance in Rotterdam
After the ship arrives in the Netherlands, our customs agency clears the vehicle. In accordance with applicable law, duty (typically 10%) and VAT (21%) are paid on your behalf.
5
Delivery to your specified address
The final step is ours - we load the prepared, customs-cleared car onto a carrier and deliver it directly to your door in Poland.
What do the prices include?
Rotterdam price
An averaged calculation of all costs incurred from the moment the vehicle is acquired until it is unloaded in Europe. It includes:
  • The vehicle's purchase value under the "Buy Now" system
  • AUTOMAX commission
  • Ground transport within the U.S. to the port
  • Ocean freight (container shipping to Rotterdam)
  • Charges related to unloading at the destination port
Final door-to-door price
This is the estimated total cost of importing the car to Poland. In addition to the Rotterdam price, it accounts for the necessary charges in Europe:
  • The Rotterdam price
  • Customs clearance service costs (agency in the Netherlands)
  • Carrier delivery from the European port to your specified home address
  • AUTOMAX commission for handling the import
EQUIPMENT AND OPTIONS
The information provided here is based solely on data supplied by the vehicle manufacturer at the time of production and may not be accurate or complete. Manheim has taken no steps to confirm the accuracy of this information, and any information disclosed here is provided "as is".
Optional packages and equipment
Packages

No data

Equipment

No detailed data / See the list below

Standard equipment
  • Auto On/Off Reflector Led Low/High Beam Auto-Leveling Daytime Running Lights Preference Setting Headlamps w/Delay-Off
  • Black Grille w/Chrome Surround
  • Black Side Windows Trim and Black Front Windshield Trim
  • Body-Colored Door Handles
  • Body-Colored Front Bumper
  • Body-Colored Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
  • Body-Colored Rear Bumper
  • Fixed Rear Window w/Defroster
  • Front Windshield includes Sun Visor Strip
  • Galvanized Steel/Aluminum/Composite Panels
  • LED Brakelights
  • Light Tinted Glass
  • Lip Spoiler
  • Perimeter/Approach Lights
  • Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
  • Tire Mobility Kit
  • Trunk Rear Cargo Access
  • Wheels w/Silver Accents
  • 10-Way Power Driver Seat includes Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt and Manual Cushion Extension
  • 10-Way Power Passenger Seat includes Power Recline, Height Adjustment, Seatback Side Bolster Support, Fore/Aft Movement, Cushion Tilt and Manual Cushion Extension
  • 2 Seatback Storage Pockets
  • 4 12V DC Power Outlets
  • 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
  • Air Filtration
  • Analog Appearance
  • Cargo Area Concealed Storage
  • Cargo Features includes Tire Mobility Kit
  • Cargo Net
  • Cargo Space Lights
  • Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
  • Day-Night Auto-Dimming Rearview Mirror
  • Delayed Accessory Power
  • Driver / Passenger And Rear Door Bins
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
  • Driver Foot Rest
  • Driver Information Center
  • Fade-To-Off Interior Lighting
  • Fixed Front Head Restraints and Manual Adjustable Rear Head Restraints
  • Front And Rear Map Lights
  • Front Cupholder
  • Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
  • Full Cloth Headliner
  • Full Floor Console w/Covered Storage and 4 12V DC Power Outlets
  • Heated Front Sport Seats includes lumbar support
  • HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
  • Illuminated Locking Glove Box
  • Immobilizer
  • Interior Lock Disable
  • Interior Trim includes Carbon Fiber Instrument Panel Insert, Carbon Fiber Console Insert and Metal-Look Interior Accents
  • Leather/Metal-Look Gear Shifter Material
  • Leatherette Door Trim Insert
  • Manual Tilt/Telescoping Steering Column
  • Memory Settings includes Driver Seat and Door Mirrors
  • Outside Temp Gauge
  • Power Fuel Flap Locking Type
  • Rear Cupholder
  • Remote Releases includes Power Cargo Access
  • Sliding Front Center Armrest and Rear Center Armrest w/Pass-Thru
  • Sport Leather Steering Wheel
  • Tracker System
  • Valet Function
  • 15.9 Gal. Fuel Tank
  • 3.46 Axle Ratio
  • 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control
  • 90-Amp/Hr 900CCA Maintenance-Free Battery
  • Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
  • Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
  • Electric Power-Assist Speed-Sensing Steering
  • Electro-Mechanical Limited Slip Differential
  • Engine Auto Stop-Start Feature
  • Engine Oil Cooler
  • Front And Rear Anti-Roll Bars
  • Gas-Pressurized Shock Absorbers
  • Multi-Link Rear Suspension w/Coil Springs
  • Regenerative 210 Amp Alternator
  • Strut Front Suspension w/Coil Springs
  • ABS And Driveline Traction Control
  • Airbag Occupancy Sensor
  • Curtain 1st And 2nd Row Airbags
  • Driver And Passenger Knee Airbag
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • Electronic Stability Control (ESC)
  • Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
  • Perimeter Alarm
  • Rear Child Safety Locks
  • Side Impact Beams
  • Tire Specific Low Tire Pressure Warning
  • 1 LCD Monitor In The Front
  • 16 Speakers
  • 600w Premium Amplifier
  • Audio Theft Deterrent
  • Bluetooth Wireless Phone Connectivity
  • Cruise Control w/Steering Wheel Controls
  • Digital Signal Processor
  • Dual Zone Front Automatic Air Conditioning
  • FOB Controls includes Keyfob Cargo Access, Keyfob Window Activation and Keyfob Sunroof/Convertible Roof Activation
  • Graphic Equalizer
  • harman/kardon Surround Sound System
  • HD Radio
  • Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Power Rear Windows
  • Proximity Key For Doors And Push Button Start
  • Radio w/Seek-Scan, In-Dash Mounted Single CD, MP3 Player, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls, Voice Activation, Radio Data System, DVD-Audio, External Memory Control and 20 Gb Internal Memory
  • Radio: AM/FM Audio System
  • Real-Time Traffic Display
  • Rear HVAC w/Separate Controls
  • Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
  • SiriusXM Satellite Radio includes 1 year All Access subscription
  • Streaming Audio
  • Tailgate/Rear Door Lock Included w/Power Door Locks
  • Window Grid Diversity Antenna

Import pojazdu 2018 BMW M3 Base do Polski

Ten pojazd (2018 BMW M3 Base, VIN WBS8M9C50J5J80290) można sprowadzić z aukcji w USA do Europy. Całkowity szacowany koszt brutto „pod dom” (cena auta, opłaty aukcyjne, transport morski, cło, VAT i odprawa celna) wynosi 156 900 PLN.

Podobne pojazdy BMW from the US

2022 BMW 3 Series Sedan M340iDoskonały · 4.6
2022 BMW 3 Series Sedan M340i
Przebieg
87 670 mi
Location
FL - OCOEE
VIN
3MW5U7J09N8C40580
$31,500Zobacz ofertę
2008 BMW M3 ConvertibleIdealny · 4.8
2008 BMW M3 Convertible
Przebieg
48 183 mi
Location
PA - Manheim Pennsylvania
VIN
WBSWL93508P330228
$33,000Zobacz ofertę
2009 BMW M3 SedanIdealny · 4.9
2009 BMW M3 Sedan
Przebieg
90 346 mi
Location
FL - Manheim Central Florida
VIN
WBSPM93599E201273
$31,491Zobacz ofertę
2020 BMW 3 Series Sedan M340i xDriveIdealny · 5.0
2020 BMW 3 Series Sedan M340i xDrive
Przebieg
68 546 mi
Location
NY - ELMONT
VIN
WBA5U9C02LFH56313
$33,500Zobacz ofertę
2024 BMW X1 Sports Activity Vehicle M35iIdealny · 5.0
2024 BMW X1 Sports Activity Vehicle M35i
Przebieg
40 637 mi
Location
FL - Manheim Central Florida
VIN
WBX13EF0XR5Z38185
$33,500Zobacz ofertę
2020 BMW 3 Series Sedan M340iWyróżniający się · 3.9
2020 BMW 3 Series Sedan M340i
Przebieg
79 934 mi
Location
FL - Manheim Central Florida
VIN
WBA5U7C02LFH86836
$33,991Zobacz ofertę
2021 BMW 3 Series Sedan M340iZnakomity · 4.1
2021 BMW 3 Series Sedan M340i
Przebieg
87 633 mi
Location
FL - Manheim Orlando
VIN
3MW5U7J0XM8B58291
$33,995Zobacz ofertę
2002 BMW M3 CoupeVery Good · 3.7
2002 BMW M3 Coupe
Przebieg
112 401 mi
Location
CO - LAKEWOOD
VIN
WBSBL93492JR13543
$34,000Zobacz ofertę
2024 BMW X1 Sports Activity Vehicle M35iDoskonały · 4.5
2024 BMW X1 Sports Activity Vehicle M35i
Przebieg
51 739 mi
Location
NJ - HASBROUCK HEIGHTS
VIN
WBX13EF02R5Y17134
$34,100Zobacz ofertę
2021 BMW 3 Series Sedan M340iDoskonały · 4.6
2021 BMW 3 Series Sedan M340i
Przebieg
90 915 mi
Location
TX - HOUSTON
VIN
3MW5U7J01M8B64867
$30,200Zobacz ofertę
2006 BMW M3 CoupeIdealny · 4.8
2006 BMW M3 Coupe
Przebieg
83 099 mi
Location
AZ - PHOENIX
VIN
WBSBL93446PN63984
$34,500Zobacz ofertę
2020 BMW 3 Series Sedan M340i xDriveIdealny · 4.7
2020 BMW 3 Series Sedan M340i xDrive
Przebieg
89 176 mi
Location
NC - RALEIGH
VIN
WBA5U9C03LFJ89395
$34,500Zobacz ofertę
2013 BMW M3 CoupeZnakomity · 4.1
2013 BMW M3 Coupe
Przebieg
73 249 mi
Location
PA - Manheim Pennsylvania
VIN
WBSKG9C52DJ592820
$29,900Zobacz ofertę
2015 BMW M3 SedanWyróżniający się · 4.0
2015 BMW M3 Sedan
Przebieg
87 780 mi
Location
GA - Manheim Georgia
VIN
WBS3C9C57FP805597
$35,000Zobacz ofertę
2015 BMW M3 SedanBardzo solidny · 3.3
2015 BMW M3 Sedan
Przebieg
76 334 mi
Location
VA - FREDERICKSBURG
VIN
WBS3C9C57FP805163
$35,000Zobacz ofertę
2018 BMW M3 SedanDoskonały · 4.5
2018 BMW M3 Sedan
Przebieg
114 333 mi
Location
FL - DELRAY BEACH
VIN
WBS8M9C58J5J78495
$35,000Zobacz ofertę
2021 BMW 3 Series Sedan M340iZnakomity · 4.3
2021 BMW 3 Series Sedan M340i
Przebieg
67 282 mi
Location
WI - MOUNT PLEASANT
VIN
3MW5U7J04M8B60182
$35,000Zobacz ofertę
2013 BMW M3 CoupeZnakomity · 4.3
2013 BMW M3 Coupe
Przebieg
74 567 mi
Location
CA - SANTA ANA
VIN
WBSKG9C57DJ594398
$35,300Zobacz ofertę