2023 BMW M3 Sedan Competition xDrive
Wystawiony jako: 2023 BMW M3 Sedan Competition xDrive
Historia Pojazdu
Adnotacje
- Blue Light / Title Absent
- Green Light / Ride & Drive
Uwagi do uszkodzeń
Front Bumper - Paint Chipped, Rear Trunk/Hatch Panel - Paint Damage, Rear Bumper - Acceptable Paint Repair
Dokumenty
- Wartość zakupu pojazdu w systemie "Kup Teraz"
- Prowizję AUTOMAX
- Transport kołowy na terenie USA do portu
- Fracht morski (transport kontenerem do Rotterdamu)
- Opłaty związane z rozładunkiem w porcie docelowym
- Cenę w Rotterdam
- Koszty usługi odprawy celnej (agencja w Holandii)
- Spedycję lawetą z portu w Europie pod wskazany adres domowy
- Prowizję AUTOMAX za obsługę importu
Remote Engine Start, Power Tailgate, BMW Head Up Display, Heated Steering Wheel
PARKING ASSISTANCE PACKAGE - ZPKParking Assistant Plus
- Black Grille
- Black Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
- Black Side Windows Trim and Black Front Windshield Trim
- Body-Colored Door Handles
- Body-Colored Front Bumper
- Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
- Fixed Rear Window w/Defroster
- Galvanized Steel/Aluminum/Composite Panels
- Headlights-Automatic Highbeams
- LED Brakelights
- Light Tinted Glass
- Lip Spoiler
- Paint w/Badging
- Perimeter/Approach Lights
- Rocker Panel Extensions
- Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
- Tire Mobility Kit
- Tire Specific Low Tire Pressure Warning
- Tires: 275/35R19 Fr & 285/30R20 Rr Performance includes Non run-flat
- Window Grid Diversity Antenna
- 12-Way Driver Seat includes Manual Cushion Extension
- 12-Way Passenger Seat includes Manual Cushion Extension
- 3 12V DC Power Outlets
- 40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
- Air Filtration
- Cargo Area Concealed Storage
- Cargo Features includes Tire Mobility Kit
- Cargo Net
- Cargo Space Lights
- Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
- Compass
- Day-Night Auto-Dimming Rearview Mirror
- Delayed Accessory Power
- Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
- Driver Foot Rest
- Driver Information Center
- Extended Merino Leather Upholstery
- Fade-To-Off Interior Lighting
- Front And Rear Map Lights
- Front Cupholder
- Full Carpet Floor Covering includes Carpet Front And Rear Floor Mats
- Full Cloth Headliner
- Full Floor Console w/Covered Storage and 3 12V DC Power Outlets
- Heated Front Seats
- Illuminated Glove Box
- Instrument Panel Covered Bin, Driver / Passenger And Rear Door Bins
- Interior Lock Disable
- Interior Trim includes Aluminum Instrument Panel Insert, Metal-Look Door Panel Insert, Aluminum Console Insert and Metal-Look Interior Accents
- Leather/Metal-Look Gear Shifter Material
- Leatherette Door Trim Insert
- Lumbar Support
- M Sport Seats
- Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
- Manual Tilt/Telescoping Steering Column
- Memory Settings includes Driver Seat and Door Mirrors
- Outside Temp Gauge
- Power Front Seats
- Power Fuel Flap Locking Type
- Rear Cupholder
- Redundant Digital Speedometer
- Sliding Front Center Armrest
- Sport Leather/Metal-Look Steering Wheel
- Trunk Rear Cargo Access
- Valet Function
- 15.6 Gal. Fuel Tank
- 3.15 Axle Ratio
- 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
- 70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
- Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
- DSC Electronic Stability Control (ESC)
- Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
- Electric Power-Assist Speed-Sensing Steering
- Electro-Mechanical Limited Slip Differential
- Electronic Transfer Case
- Engine Auto Stop-Start Feature
- Engine Oil Cooler
- Front And Rear Anti-Roll Bars
- Gas-Pressurized Shock Absorbers
- M Traction Control ABS And Driveline Traction Control
- Multi-Link Rear Suspension w/Coil Springs
- Regenerative Alternator
- Strut Front Suspension w/Coil Springs
- Transmission w/Driver Selectable Mode, M Steptronic Sequential Shift Control w/Steering Wheel Controls and Oil Cooler
- Airbag Occupancy Sensor
- Blind Spot Detection Blind Spot
- Collision Mitigation-Front
- Curtain 1st And 2nd Row Airbags
- Driver And Passenger Knee Airbag
- Driver Monitoring-Alert
- Dual Stage Driver And Passenger Front Airbags
- Dual Stage Driver And Passenger Seat-Mounted Side Airbags
- Frontal Collision Warning
- Immobilizer
- Lane Departure Warning
- Outboard Front Lap And Shoulder Safety Belts includes Rear Center 3 Point and Pretensioners
- Park Distance Control Front And Rear Parking Sensors
- Perimeter Alarm
- Rear Child Safety Locks
- Rear Collision Prevention
- Side Impact Beams
- Cruise Control w/Steering Wheel Controls
- Dual Zone Front Automatic Air Conditioning
- FOB Controls includes Keyfob Cargo Access and Keyfob Window Activation
- HVAC includes Underseat Ducts, Residual Heat Recirculation and Console Ducts
- Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
- Power Door Locks w/Autolock Feature
- Power Rear Windows
- Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
- Rear HVAC w/Separate Controls
- Remote Keyless Entry w/Integrated Key Transmitter, 4 Door Curb/Courtesy, Illuminated Entry and Panic Button
- Remote Releases includes Proximity Cargo Access
- Tailgate/Rear Door Lock Included w/Power Door Locks
Podobne pojazdy BMW z USA
Idealny · 4.9- Przebieg
- 19 931 mi
- Lokalizacja
- CT - STAMFORD
- VIN
- WBS33HJ07SFU21398
Idealny · 4.9- Przebieg
- 11 173 mi
- Lokalizacja
- CA - Manheim California
- VIN
- WBS33HJ02SFU20319
Doskonały · 4.6- Przebieg
- 2361 mi
- Lokalizacja
- MD - WALDORF
- VIN
- WBS33HJ01TFW14034
Doskonały · 4.6- Przebieg
- 2172 mi
- Lokalizacja
- UT - SALT LAKE CITY
- VIN
- WBS33HJ02TFW33840
Idealny · 4.9- Przebieg
- 4474 mi
- Lokalizacja
- AZ - TEMPE
- VIN
- WBS23HJ09TFV99004
Idealny · 4.8- Przebieg
- 19 847 mi
- Lokalizacja
- GA - ROSWELL
- VIN
- WBS23HJ07SFT76720
Doskonały · 4.6- Przebieg
- 6468 mi
- Lokalizacja
- OH - Manheim Ohio
- VIN
- WBS23HJ0XTFV49373
Idealny · 4.8- Przebieg
- 36 055 mi
- Lokalizacja
- PA - Manheim Pennsylvania
- VIN
- WBS43AY08PFP55433
Idealny · 4.9- Przebieg
- 22 245 mi
- Lokalizacja
- AZ - GILBERT
- VIN
- WBS43AY06PFR13803
Idealny · 5.0- Przebieg
- 1860 mi
- Lokalizacja
- CA - Costa Mesa
- VIN
- WBS33HJ00TFW38504
Idealny · 5.0- Przebieg
- 7111 mi
- Lokalizacja
- CA - AGOURA HILLS
- VIN
- WBS43AY02RFS18558
Idealny · 5.0- Przebieg
- 3378 mi
- Lokalizacja
- WI - WAUKESHA
- VIN
- WBS33HJ07SFV13904
Doskonały · 4.4- Przebieg
- 22 897 mi
- Lokalizacja
- GA - ATHENS
- VIN
- WBS33AY0XPFP56451
Idealny · 5.0- Przebieg
- 6815 mi
- Lokalizacja
- NY - CARMEL
- VIN
- WBS13HJ09TFV78620
Idealny · 4.8- Przebieg
- 2167 mi
- Lokalizacja
- CA - Manheim Riverside
- VIN
- WBS13HJ07TFV69043
Idealny · 4.9- Przebieg
- 9611 mi
- Lokalizacja
- NY - WESTBURY
- VIN
- WBS53AY07NFM93034
Wyróżniający się · 3.9- Przebieg
- 12 825 mi
- Lokalizacja
- GA - ALPHARETTA
- VIN
- WBS43AY03PFP19584
Idealny · 5.0- Przebieg
- 15 033 mi
- Lokalizacja
- CA - ROSEMEAD
- VIN
- WBS53AY07RFR63150